background image

GoBoard Wedge Installation

 

(continued)

Johns Man

ville

Building Insul

ation Div

ision

717 17th Street

Denver

, CO 80202

1-800-6

54-3103,  w

ww

.JM.com/GoBoa

rd

4-f

t x 8-f

t Durable

, lightw

eight, waterproof tile back

er board

Limited 

Warr

anty - 

Visit JM.com/

GoBoa

rd for warr

anty information

Visit JM.com/

GoBoa

rd for install

ation instruc

tions

®

®

®

2015121910171

®

Johns Man

ville

Building Insulation Division

717 17th Street

Denver

, CO 80202

1-800-654-31

03,  w

ww.JM.com/GoBoa

rd

4-f

t x 8-f

t Durable

, lightw

eight, waterproof tile back

er board

Limited 

Warr

anty - 

Visit J

M.com/GoBoa

rd for warr

anty information

Visit

 JM.com/GoBoa

rd for install

ation inst

ruc

tions

®

®

®

2015121910171

®

Johns

 Man

vill

e

Buildin

g In

sul

atio

n Div

isio

n

717

 17

th St

ree

t

Den

ver

, C

O 8

020

2

1-800

-65

4-3

103

,  w

ww

.JM

.co

m/

GoBo

ard

4-f

t x

 8-f

t Durable

, lightw

eight

, wat

erpr

oo

f til

e bac

ker 

bo

ard

Lim

ited

 W

arr

anty

 - V

isit

 JM

.co

m/

GoBo

ard fo

r war

ranty

 inf

orm

atio

n

Visit

 JM

.co

m/

GoBo

ard 

for inst

allat

ion inst

ruc

tio

ns

®

2015121910171

®

Johns

 Man

ville

Build

ing In

sulat

ion Div

isio

n

717 1

7th St

reet

Den

ver, C

O 80

202

1-80

0-654

-310

3,  w

ww.JM

.com

/GoBo

ard

4-ft x

 8-ft Durable

, lightw

eight, wat

erpr

oo

f tile bac

ker 

bo

ard

Lim

ited

 War

ranty

 - Visit

 JM

.co

m/GoBo

ard fo

r war

ranty

 info

rm

atio

n

Visit

 JM

.co

m/GoBo

ard f

or inst

allat

ion inst

ruc

tions

®

2015121910171

®

27

©2019 Johns Manville. All Rights Reserved

8

Install 

front

 and 

back

 cut wedge panels by pressing firmly into

thin set. Ensure that there is a 1/8” gap at clamping collar, side 

walls, curb and wedge panels.

Note: 

Thinner side of wedge panel should always face the drain.

Fill 1/8” gaps, including between clamping collar and wedge

panels, with sealant and spread excess sealant with a putty knife

at least 1” from either side of 1/8” gaps. For the 90 degree inside

corners, use a 90 degree putty knife to ensure the inside corners

are completely sealed.

Johns Man

ville

Building Insul

ation Division

717 17th

 Street

Denver

, CO 80202

1-800-6

54-3103,  w

ww

.JM.com/GoBoa

rd

4-f

t x 8-f

t Durable

, lightw

eight, waterproof tile back

er board

Limited 

Warr

anty - 

Visit JM.com/

GoBoa

rd for warr

anty information

Visit JM.com/

GoBoa

rd for install

ation instruc

tions

®

®

®

2015121910171

®

Johns Man

ville

Building Insulatio

n Division

717 17th Street

Denver

, CO 8020

2

1-800-6

54-31

03,  w

ww.JM.com/GoBoa

rd

4-f

t x 8-f

t Durable

, lightw

eight, waterproof tile back

er board

Limited 

Warr

anty - 

Visit JM.com/GoBoa

rd for warr

anty information

Visit JM

.com/GoBoa

rd for install

ation inst

ruc

tions

®

®

2015121910171

®

Johns

 Man

vill

e

Building

 Insu

lat

ion

 Div

isio

n

717

 17

th St

ree

t

Den

ver

, C

O 8

020

2

1-80

0-6

54-

310

3,  w

ww

.JM

.co

m/

GoBoard

4-f

t x

 8-f

t Durable

, lig

htw

eig

ht, wat

erp

roo

f til

e ba

cker b

oard

Lim

ited

 W

arr

anty

 - V

isit

 JM

.co

m/

GoBo

ard fo

r warr

anty

 inf

orm

atio

n

Visit

 JM

.co

m/

GoBo

ard fo

r inst

allat

ion ins

truc

tio

ns

®

2015121910171

®

Johns

 Man

ville

Building

 Insu

latio

n Div

ision

717 1

7th St

reet

Den

ver, C

O 80

202

1-80

0-65

4-31

03,  w

ww.JM

.com

/GoBo

ard

4-ft x

 8-ft Durable

, lightw

eight, wat

erproo

f til

e ba

cker bo

ard

Lim

ited

 War

ranty

 - Visit

 JM

.co

m/GoBo

ard for war

ranty

 info

rm

atio

n

Visi

t JM

.com

/GoBo

ard f

or inst

allat

ion 

inst

ruc

tions

®

2015121910171

®

28

1"

1"

1"

1"

Transition Membrane Installation

29

1"

1"

30

After removing tape dot and folding membrane edges up, Apply

a 1/4” bead of GoBoard Sealant on top of clamping collar near

folded membrane, fill remaining gaps between clamping collar

and wedge panels and apply another 1/4” bead of sealant

around the perimeter of the drain base approximately 1” from

clamping collar as shown.

Unfold membrane so it is lying flat over beads of GoBoard Sealant 

and wedge panels. Using a putty knife, start spreading sealant 

underneath membrane closest to center of drain moving out. 

Continue around drain until entire membrane is adhered to

wedge panels with sealant.

Note: 

Use moderate pressure when smoothing and spreading

sealant under membrane. A continuous layer of sealant MUST

remain underneath membrane.

Summary of Contents for GoBoard Point Drain

Page 1: ...eparately 4 GoBoard Wedges 1 2 GoBoard Panels GoBoard Curb 3 5 H x 2 5 W x 48 L GoBoard Sealant GoBoard Fasteners or GoBoard Washers thin set mortar and PVC primer and solvent cement Installation Instructions A Drain Cover B Drain Riser C Clamping Collar D Membrane E PVC Drain Body F Clamping Collar Screws G Mixing Valve Seal H Waterproof Pipe Seal I 2 Plastic Putty Knife J 4 Round Tape Dot K Drai...

Page 2: ...ener locations require a waterproof sealant Make sure floor is level floor must be level for proper installation Find the center of the shower pan area or as close to center as framing allows Please review page 10 for possible layouts Top of waste pipe MUST be at least 1 5 8 below the top of the subfloor For remodels cut existing waste pipe as needed with inside pipe cutting tool Using measurements f...

Page 3: ...mbrane D to view waste pipe inside GoBoard Point Drain body The waste pipe should be within 1 4 or less from fins to ensure a secure and water tight connection Install valve seal G over valve and waterproof pipe seal H over shower pipe using GoBoard Sealant Fold front and back and then left and right of membrane D inward Install GoBoard Point Drain assembly and fasten to subfloor using provided scre...

Page 4: ...ping collar is exposed In curb location apply two 1 4 beads of GoBoard Sealant Apply several 1 4 beads on curb both sections if more than 1 curb required surfaces in contact with subfloor and walls Spread excess GoBoard Sealant onto subfloor and curb on shower side Remove excess sealant on bathroom side of curb Optional Secure curb to subfloor with 4 1 2 screws 1 per linear foot to prevent accidental...

Page 5: ...n s Ma nv ille Build ing Insula tion Divisi on 717 17th Stree t Denv er CO 8020 2 1 800 654 3103 www JM co m Go Board 4 ft x 8 ft Dura ble light weig ht wate rproo f tile back er boar d Limit ed Warr anty Visit JM co m Go Boar d for warra nty infor matio n Visit JM co m Go Boar d for insta llatio n instru ction s 20 15 12 19 10 17 1 Jo hn s Ma nv ille Build ing Insula tion Divisi on 717 17th Stree...

Page 6: ... Warr anty Visit JM co m Go Boar d for warr anty infor mati on Visit JM co m Go Boar d for insta llatio n instr uctio ns 20 15 12 19 10 17 1 Jo hn s Ma nv ille Build ing Insula tion Divis ion 717 17th Stree t Denv er CO 8020 2 1 800 654 3103 www JM c om G oBoa rd 4 ft x 8 ft Dura ble light weig ht wate rproo f tile back er boar d Limit ed Warr anty Visit JM co m Go Boar d for warr anty infor mati ...

Page 7: ...15 12 19 10 17 1 Jo hn s Ma nv ille Build ing Insula tion Divisi on 717 17th Stree t Denv er CO 8020 2 1 800 654 3103 www JM co m Go Board 4 ft x 8 ft Dura ble light weig ht wate rproo f tile back er boar d Limit ed Warr anty Visit JM co m Go Boar d for warra nty infor matio n Visit JM co m Go Boar d for insta llatio n instru ction s 20 15 12 19 10 17 1 Joh ns Man ville Bui ldin g Ins ula tion Div...

Page 8: ...ed Jo hn s Ma nv ille Build ing Insula tion Divisi on 717 17th Stree t Denv er CO 80202 1 800 654 3103 www JM co m Go Board 4 ft x 8 ft Dura ble light weig ht wate rproo f tile back er boar d Limit ed Warr anty Visit JM co m Go Boar d for warra nty infor matio n Visit JM co m Go Boar d for insta llatio n instru ction s 20 15 12 19 10 17 1 Jo hn s Ma nv ille Build ing Insula tion Divisi on 717 17th...

Page 9: ...ess GoBoard Sealant around perimeter of membrane as shown in illustration Make all necessary preparations for installing tile Mix thin set mortar per manufacturers instructions Using a putty knife pack thin set mortar underneath drain cover as shown Drain Cover Installation Install the drain cover assembly into the center of the drain The radial fins are designed to accommodate most 2 drain cover ...

Page 10: ...ft x 8 ft durable lightweght warterproof backer board Limited Warranty Visit JM com GoBoard for warranty information Johns Manville Building Insulation Division 717 17th Street Denver CO 80202 1 800 654 3103 www JM com GoBoard 8 ft x 8 ft durable lightweght warterproof backer board Limited Warranty Visit JM com GoBoard for warranty information 48 48 48 48 Johns Manville Building Insulation Divisio...

Page 11: ...www JM com GoBoard 8 ft x 8 ft durable lightweght warterproof backer board Limited Warranty Visit JM com GoBoard for warranty information Johns Manville Building Insulation Division 717 17th Street Denver CO 80202 1 800 654 3103 www JM com GoBoard 8 ft x 8 ft durable lightweght warterproof backer board Limited Warranty Visit JM com GoBoard for warranty information Johns Manville Building Insulatio...

Page 12: ...ng Insulation Division 717 17th Street Denver CO 80202 1 800 654 3103 www JM com GoBoard 8 ft x 8 ft durable lightweght warterproof backer board Limited Warranty Visit JM com GoBoard for warranty information Johns Manville Building Insulation Division 717 17th Street Denver CO 80202 1 800 654 3103 www JM com GoBoard 8 ft x 8 ft durable lightweght warterproof backer board Limited Warranty Visit JM ...

Reviews: