background image

ITEM NO.: OF-64C AND OF-64T
ISSUED DEC 17, 2015

Printed in Vietnam

THIS ITEM IS PACKED IN TWO CARTONS

- 1 -

Description
Item No.

: CANYON EXECUTIVE DESK BASE
: OF-64C AND OF-64T

ASSEMBLY INSTRUCTIONS

Summary of Contents for OF-64C

Page 1: ...ITEM NO OF 64C AND OF 64T ISSUED DEC 17 2015 Printed in Vietnam THIS ITEM IS PACKED IN TWO CARTONS 1 Description Item No CANYON EXECUTIVE DESK BASE OF 64C AND OF 64T ASSEMBLY INSTRUCTIONS ...

Page 2: ... purchased If hardware is missing or you need help with assembly please call toll free 888 944 8396 IMPORTANT NOTE Place all wooden parts on a clean and smooth surface such as a rug or carpet to avoid the parts from being scratched Remove all wrapping material including staples packing straps before you start to assemble DO NOT tighten all screws bolts until completely assembled Keep all hardware ...

Page 3: ...ard any parts with the packaging Before continuing please make sure you have the following parts NO Description Qty Sketch A Top 1 PART LIST OF 64C When unpacking please be careful not to discard any parts with the packaging Before continuing please make sure you have the following parts NO Description Qty Sketch NO Description Qty Sketch B Cross bar 1 C Base 2 ...

Page 4: ...are NO Description Qty Sketch NO Description Qty Sketch 1 Short bolt M8 x 50mm 8 2 Long bolt M8 x 70mm 2 3 Lock Washer 8 5 x 13mm 8 4 Flat Washer 8 5 x 19mm 8 5 U Washer M8 2 6 Allen Key M4 x 107mm 1 7 Wooden knob 4 8 Pan head screw M4 x 30mm 4 METAL KNOB 30x30mm ASSEMBLED INTO TOP OF 64T FINISHED BY PRODUCER 4 NOTE HARDWARE IS PACKED IN CARTON OF 64C STEP 1 Attach cross bar B to the bases C with ...

Page 5: ...HIS ITEM IS PACKED IN TWO CARTONS 5 STEP 2 Attach the bases C to the top A from step 1 with bolts 1 and washers 3 and 4 as shown below Tighten with Allen key 6 STEP 3 Attach knobs 7 to front of drawers with pan head screws 8 as shown below Tighten with a screwdriver ...

Reviews: