Sunflex , Keys Park Road, Hednesford, Cannock, WS12 2FR
• tel: +44 (0)330 005 2233 • fax: +44(0) 1543 279505
• email: [email protected] • web: www.sunflex.co.uk
90˚
45˚
90˚
45˚
Fixing the finial
(fig.18)
1. Place one of the solid rings on the pole after the bracket.
2. Slide the finial onto the pole and tighten the grub screw until
the finial is secure.
For Stud finials
(fig.19)
1. Place one of the full rings on the pole after the bracket.
2. Push the plastic bung end of the stud finial into the pole until it
is secure.
15
14
90˚
45˚
16
18
19
21
20
Installing the curtain
1. Equally space curtain hooks along curtain header, you will
require one hook for every ring. (fig.20)
2. Place hooks through the eyelet on the ring. (fig.20)
3. Test the installation by drawing the curtains across the pole.
(fig.21)
2.95
2.95
2.95
17
Fitting the Bay Corner
1. Adjust the bay corner into the desired angle by loosening the
segment screw. Once in the desired positon sligthly tighten the
screw. (fig.14)
2. Slide the poles onto the plastic bung ends of the bay corners.
Note: Fully secure the screws on the bay corner once the bay
pole is fully installed. (fig.15)
Bay corners should always be supported by two pass over
brackets.
Fixing the pole
(fig. 17)
1. Loosen the grub screw on the bracket.
2. Place pole in bracket.
3. Tighten the grub screw until the pole does not slide in the
bracket.
Preparing the curtain
(fig.16)
1. Leave the solid rings aside, slide an equal amount of pass over
rings on each side of the bay (approximately 1 ring per 10cm
of pole).
2. Finish each side by adding 1 solid ring per side onto the pole.