SECTION 6 - JLG CONTROL SYSTEM
3121259
– JLG Lift –
6-17
6.5
CONTROL SYSTEM STARTUP CHECKS
The following actions and checks are performed during sys-
tem startup:
• Inhibit all hydraulic functions
• Energize all Ground and Platform Station indicators and
energize the Platform Alarm.
• Perform assessments as shown in Table 6-5, System Startup
Table 6-5. System Startup Checks
Item Checked
Function
Condition/Action
NOTE: In this table, abbreviations STB=Short To Battery, STG=Short to Ground, and OC=Open Circuit.
System Communications
CAN Bus 1
Ground Module and Platform module to perform suc-
cessful CAN Bus communication
Successful communication
Verify healthy CAN Bus and presence of Platform Mod-
ule
Successful communication
If applicable, confirm presence of LSS system
Successful communication
CAN Bus 2
If applicable, confirm presence of ECU
Successful communication
Ground Station
Digital and Functional Switch Inputs
Engine Start
Open; de-energized
Function Enable
Open; de-energized
Swing Left
Open; de-energized
Swing Right
Open; de-energized
Tower Lift Up
Open; de-energized
Tower Lift Down
Open; de-energized
Lift Up
Open; de-energized
Lift Down
Open; de-energized
Telescope In
Open; de-energized
Telescope Out
Open; de-energized
Jib Up
Open; de-energized
Jib Down
Open; de-energized
Level Up
Open; de-energized
Level Down
Open; de-energized
Rotate Left
Open; de-energized
Rotate Right
Open; de-energized
Summary of Contents for 340AJ
Page 1: ...Service and Maintenance Manual Model 340AJ P N 3121259 June 27 2017...
Page 2: ......
Page 10: ...vi JLG Lift 3121259 TABLE OF CONTENTS SECTION NO TITLE PAGE NO Thispageleftblankintentionally...
Page 15: ...3121259 JLG Lift xi LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 18: ...xiv JLG Lift 3121259 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Page 42: ...SECTION 2 GENERAL 2 12 JLG Lift 3121259 NOTES...
Page 69: ...SECTION 3 CHASSIS TURNTABLE 3121259 JLG Lift 3 27 Figure 3 24 Bearing Pressing Tool...
Page 71: ...SECTION 3 CHASSIS TURNTABLE 3121259 JLG Lift 3 29 Figure 3 27 Bearing Nut Wrench...
Page 134: ...SECTION 3 CHASSIS TURNTABLE 3 92 JLG Lift 3121259 NOTES...
Page 157: ...SECTION 4 BOOM PLATFORM 3121259 JLG Lift 4 23 Figure 4 8 Rotator Counterbalance Valve...
Page 218: ...SECTION 5 HYDRAULICS 5 58 JLG Lift 3121259 Figure 5 32 Fasteners and Plugs Sheet 1 of 2...
Page 219: ...SECTION 5 HYDRAULICS 3121259 JLG Lift 5 59 Figure 5 33 Fasteners and Plugs Sheet 2 of 2...
Page 236: ...SECTION 5 HYDRAULICS 5 76 JLG Lift 3121259 Figure 5 39 Gear Pump Cutaway...
Page 246: ...SECTION 5 HYDRAULICS 5 86 JLG Lift 3121259 Figure 5 40 Oil Sampling Port...
Page 256: ...SECTION 6 JLG CONTROL SYSTEM 6 10 JLG Lift 3121259 Figure 6 3 Ground Module Sheet 1 of 4...
Page 273: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 27 Figure 6 16 Analyzer Machine Setup Menu...
Page 274: ...SECTION 6 JLG CONTROL SYSTEM 6 28 JLG Lift 3121259 Figure 6 17 Analyzer Calibrations Menu...
Page 336: ...SECTION 6 JLG CONTROL SYSTEM 6 90 JLG Lift 3121259 NOTES...
Page 368: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121259 NOTES...
Page 369: ......