background image

Note

 Build sun& rain shade to avoid direct 

           exposure to sunlight and rain.

Note

:  The switch connect PCS to JKS-B5150-BI, we recommend the use of molded case circuit breaker 

           with rated working voltage greater than 80V and rated working current greater than 125A.

6.Terminal Connection

8.Key Operation

Power Button

Situation

System of f

System on

Touch

Press(

2S)

Press(

2S)

Press once

No reaction

Power on

Shut down

9.Service and Contact

Jinko Solar Co., Ltd.

 Installation Procedure

6

7

8

9

10

GND terminal

Positive terminal

USB interface

LED indicator

Power button

1

2

3

4

5

PCS CAN communication

LINK-IN CAN communication

LINK-OUT CAN communication

Safety vent

Negative terminal

3-2

4.Installation Environment

   5.Wire Connection  

Connection End Face Introduction 

5-1

Diagram of Wiring Connection 

5-2

Power Terminal  

6-1

Note:

  Avoid drilling holes in the water pipes and cables buried in the wall.

Note

:  When multiple battery modules are used in parallel connection, you only need to press one key of any module to start the system, 

           and also press one key to shut down the battery system. 

ALM/RUN light turns green when powered on

11

Communication Terminal 

6-2

7.Battery System Switch Operation

Power ON Battery System

Power OFF Battery System

Turn the circuit breaker to the "ON" position. Press the 
power button for 3 seconds to turn on the battery. The 
battery LED indicator lights up to indicate that the battery 
has been turned on.

Turn the circuit breaker to the "OFF" position. 
Press the power button to turn of f  the battery.
The battery LED indicator is of f , and the battery 
has been turned of f .

Circuit breaker

11

No.1, Jinko Road, Shangrao Economic Development Zone Shangrao City,
Jiangxi Province, 334100, P.R. China

      [email protected]

      www.jinkosolar.com