5.0 Storage and preservation 

 
The purpose of this chapter is to specify how to handle and preserve a product from the 
day of shipment until the equipment is installed and commissioned. 

 
Following conditions shall be observed for the installation/construction period. 

 

 
CAUTION 

 

 

During storage, prior to installation the unit must be stored 
dry with a relative humidity <60 %, temperature >15ºC.

 

 
CAUTION

 

 

Replace desiccant bag in junction boxes and enclosures (if 
any) every 6 months. 
Keep a log of the replacements as documentation. 

 
CAUTION 
 

The Anti condensation heater, if any, must be powered up 
and connected at all time. 

 
 
5.1 Preservation during the transportation and pre-installation period 
 
The packaging provides both mechanical and environmental protection. If the equipment 
is intended for service in an outdoor environment, to avoid any risk of harmful metallic dust 
during storage it is protected with enveloping plastic foil.

 

 

All openings such as cable entry holes are adequately sealed. 
 
Packages must not be opened, or their integrity disturbed during the transport. 
Packing may only be opened when the equipment has been taken from storage and has 
been transported to its intended location of installation, or to connect the anti-condensation 
heater,  after  which  the  packing  must  be  resealed.  Storage  preservation  measures  are 
immediately invalidated as soon as the packaging is disturbed. 
 
One shall inspect packages on receipt at the storage warehouse and at regular monthly 
intervals during the storage period in regard to external damages. Any visible damage that 
may have a consequence to the condition of the contents or integrity of the preservation 
must  be  immediately  documented  and  reported.  In  case  of  such  an  event,  the  supplier 
must be contacted immediately for advice

 

 

5.2 Preservation during the installation/construction period 
 
The product must be unpacked only when the equipment is to be installed, or to connect 
the anti-condensation heater. It is recommended to maintain the integrity of the packaging 
during transport from the storage warehouse to the installation site. 
Inspect  the  equipment  within  each  package  for  damage  and  condition  as  soon  as  the 
package is opened. Report and document any damage immediately. In case of such an 
event, the supplier must be contacted immediately for advice. 
 
Installation  and  handling  of  the  equipment  once  unpacked  must  be  performed  in 
accordance with the relevant elements of the documentation for the equipment delivered.  

Summary of Contents for EF Series

Page 1: ...to third parties of this manual or part of it in any form is not permitted without prior written authorisation of the proprietor IOM INSTALLATION OPERATION AND MAINTENANCE MANUAL FOR EF DUCT HEATERS...

Page 2: ...installation period 9 5 2 Preservation during the installation construction period 9 5 3 Suggestion for preservation specification record 11 6 0 Installation instructions 12 6 1 General 12 6 2 Special...

Page 3: ...arning notice representing the highest degree of danger will be used A notice warning of injury to persons with a safety symbol may also include a warning relating to property damage Qualified Personn...

Page 4: ...ANT These instructions should be read thoroughly before installation and operation All warnings and precautions should be observed for both personal safety and for proper equipment performance and lon...

Page 5: ...Arrangement Drawing HVAC Heating ventilation Air Conditioning IOM Installation Operating and Maintenance Manual JB Junction Box VLE Fan heater with integrated controls for temperature control VLEx Fan...

Page 6: ...t importantly to general safety precautions which are not necessarily related to any specific part or procedure and do not necessarily appear elsewhere in the publication These precautions must be tho...

Page 7: ...tified transmitter Ex ia IIC T4 T6 Ga end user applies barrier reset must be done by hand Temperature sensors are placed at the highest temperature areas of the heating bundle In case of no airflow th...

Page 8: ...e mass loaded on the pallet Where feasible the top surface of the pallet must be flat The pallet must be tight on all sides with steel or synthetic straps on each side Bolts clamps supporting beams et...

Page 9: ...packing is easily moved either by forklift or by use of crane handled by authorised personnel For lifting lugs see GA For weight see GA or rating plate For COG if any see GA CAUTION Heating elements...

Page 10: ...rage and has been transported to its intended location of installation or to connect the anti condensation heater after which the packing must be resealed Storage preservation measures are immediately...

Page 11: ...n Remove debris from cable installation activities at once Take precautions to avoid any small pieces of a conductive nature from being left in the termination enclosures Under no circumstances may th...

Page 12: ...then the supplier must be contacted for advice regarding renewal of the desiccant bag 5 12 Check the paintwork 6 12 Check that there are no visual damages to the equipment 7 12 Verify that the general...

Page 13: ...ater Installation Before unpacking the equipment ensure that all items are available and that all crates or packages are in good condition and undamaged Any damages must be reported to the site manage...

Page 14: ...again 10 C continue this procedure until TSH cuts off the heater Adjust the TSH scale up with10 C and add the difference between the inlet Test the heater with full load and switch off airflow TSH mu...

Page 15: ...secured 4 The electrical connections have been performed in accordance with the relevant regulations and wiring diagram 5 The heater has been properly installed and all studs and nuts are properly tig...

Page 16: ...ected e g for avoiding electrostatic discharge 4 Monitoring systems have been actuated e g Flow Monitoring and Overheat Protection 5 The medium to be heated is in accordance with the heater design At...

Page 17: ...lements for damage 2 Check the insulation resistance of the heating elements Connect the Megger to an earth bolt and one of the phases U1 V1 or W1 If the measured value is less than 2 Mega ohms each h...

Page 18: ...Change desiccant bag in the storage period Cleaning interior and exterior with compressed air Electrical system Measurement of Ohm values according to test record max deviation 10 Checking the wiring...

Page 19: ...problem is not listed or it is not eliminated by listed corrective measures immediately contact JEVI A S for assistance Problem Possible cause Possible correction Heater Resistor failure Loose bus bar...

Page 20: ...1 0 Disposal instructions Equipment containing electrical components shall not be disposed together with domestic waste Collect separately with other electrical and electronic waste according to local...

Page 21: ...08099901 20 Notes...

Page 22: ...08099901 21...

Page 23: ...08099901 22...

Page 24: ...08099901 23 JEVI A S Godth bsvej 7 DK 7100 Vejle T 45 75 83 02 11 jevi jevi dk www jevi com 08099901 06 2020...

Reviews: