![JetCom SR 71 Blackbird EDF Construction Manual Download Page 6](http://html1.mh-extra.com/html/jetcom/sr-71-blackbird-edf/sr-71-blackbird-edf_construction-manual_646140006.webp)
+++ construction manual SR 71 Blackbird (EDF Version) from ++
Installation of the rudders
The functional installation of the rudder does not support the flight qualities.
However, to follow specific requirements the rudders can be installed functional as
follows:
You need to cut the rudder as shown in the pictures below.
A balsa structure frame is provided inside the rudder. This frame is located in the
middle of the saw kerf for fixing the hinges. To allow mobility you need to add a
piece of balsa wood at the front of the rudder. Afterwards the balsa should be
tapered by grinding it.
Now you need to glue the hinges in the front of both parts of the rudder.
Page 7 of 20
EDF version 1.0
Summary of Contents for SR 71 Blackbird EDF
Page 16: ... construction manual SR 71 Blackbird EDF Version from JetCom Page 17 of 20 EDF version 1 0 ...
Page 17: ... construction manual SR 71 Blackbird EDF Version from JetCom Page 18 of 20 EDF version 1 0 ...
Page 18: ... construction manual SR 71 Blackbird EDF Version from JetCom Page 19 of 20 EDF version 1 0 ...