background image

 

4

Specifications: RM-22T 

 
Stock Number................................................................................................................................ 756022 
Capacity ......................................................................................................................................22 gauge 
Distance Between Shaft Centers ............................................................................................................ 2” 
Depth of Throat to Frame........................................................................................................................ 7” 
Overall Dimensions (LxWxH) .................................................................................................... 18”x8”x16” 
Net Weight ...................................................................................................................................... 64  lbs. 
 
 

Uncrating and Clean-Up 

 
1.  Remove the RM-22T from the crate. 
 
2.  Carefully clean all rust protected surfaces 

with a mild solvent or kerosene and a soft 
rag.  Do not use lacquer thinner, paint 
thinner, or gasoline.  These will damage 
painted surfaces. 

 
3.  Lubricate all moving parts of the machine 

with light grease or heavy oil. 

 
4.  Carefully move the machine to a well lighted 

area and attach to a solid, level work bench. 

 
5.  Machine location must allow access to all 

sides. 

 
 

Setup for Rolls 

 
The (#) in the text refers to the breakdown and 
parts list. 
 
1.  Use the spanner wrench to remove the roll 

nut #45 and install the different roll 
combinations. 

 
2.  According to the material thickness, lower 

the upper shaft #11 by turning the handle 
assembly #16. 

 
3.  Turn the adjusting nut #26 to align the upper 

and lower rolls.  To facilitate the movement, 
push in on the upper roll while turning the 
adjusting nut.  Tighten the set screw #57. 

 
4.  According to the size of the work piece 

adjust the gauge stop #31 by turning knurled 
nuts #33 to the proper position.  You can 
also adjust the gauge seat #30 by loosening 
the set screw #32.   

 
5.  The work piece can now be inserted 

between the rolls.  Turn handle assembly 
#16 until the rolls lightly press on the 
material.  Slowly turn handle #38 while 
handle assembly #16 is rotated to give the 
desired shape. 

 

Lubrication 

 
1.  There are two grease fittings #24 that need 

to be greased once a month.   

 
2.  The machine must be lubricated every day 

of service with a few drops of oil.  An oil 
pinhole is located at the end of the lower 
shaft #34, and upper shaft #11. 

 
3.  Every thirty days of operation grease the 

gears by removing the gear cover #36. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Reviews: