9
Read and understand the entire
contents of this manual before attempting set-
up or operation. Failure to comply may cause
serious injury.
5.0
Set-up and assembly
Open shipping container and check for shipping
damage. Report any damage immediately to your
distributor and shipping agent. Do not discard any
shipping material until the Turret Mill is assembled
and running properly.
Compare the contents of your container with the
following parts list to make sure all parts are intact.
Missing parts, if any, should be reported to your
distributor. Read the instruction manual thoroughly
for assembly, maintenance and safety instructions.
If your mill is supplied with an optional Table
Powerfeed and/or DRO, be sure to consult the
separate instruction materials that accompany
them.
5.1
Contents of shipping container
Note: Some parts may be pre-installed on the mill.
Figure 5-1: contents
1
Turret Mill (not shown)
1
Chip tray (not shown)
1 Flat
Way
Cover
1 Pleated
Way
Cover
1 Draw
Bar
3 Table
Adjustment
Handles
1
Tool Box, containing:
4 Leveling
pads
1
Hex Key Set (1.5-10mm) *
1 17/19mm
Box
Wrench
*
1
Cross Point Screw Driver #2 *
1
Flat Blade Screw Driver #2 *
1
Oil Can *
1 Elevating
Crank
Handle
1 Handwheel
1
Coarse Feed Handle
1 Lifting
ring
1
Electric box key
1 Operator’s
Manual
1 Warranty
Card
* parts with an asterisk are also included in the tool
box service kits, p/n JTM1254VS-TB and
JTM1254RVS-TB.
5.2
Preparing the mill for service
1. Remove any crating which may be covering the
machine on the pallet.
2. Remove accessory items from pallet or
machine table. Compare items with
section 5.1
.
3. Check lifting ring on ram to be certain it is tight.
4. Check tightness of lock handles on ram (C and
E, Figure 9-3) to be certain ram is locked tight.
5. Remove nuts and bolts which secure machine
to pallet.
6. Center an overhead crane or other suitable
overhead lifting device and sling arrangement
over the lifting ring.
Note:
This machine weighs over 3000 pounds
– be certain lifting arrangement is new or in
excellent condition and has a safety factor that
will account for age, difficulties in lifting, etc.
When lifting using the ring, the machine will tip
forward. If you wish, you can minimize this
tipping by rigging a support sling over front of
machine. Be careful when doing this, to prevent
sling from damaging any components on front
of machine. Be sure to steady mill to prevent it
from spinning.
7. Lift machine off pallet no higher than necessary
to clear hold-down hardware, then pull pallet out
of the way. Do NOT get hands or feet
underneath machine when removing pallet!
8. Put machine base over hold-down system
where machine will be spotted. Anchor bolts
(not provided) of sufficient size and length must
be fastened to the floor according to footprint of
mill. See Figure 4-1.
Note:
Figure 4-1 shows maximum dimensions
of machines with table, ram, etc., fully extended
in all possible directions. When spotting
machine, be certain to leave room not only for
the machine itself, but also for operator
clearance and clearance for workers servicing
the machine, and any unusual sizes of
workpieces that might extend off the machine’s
table.
Summary of Contents for JTM-1254VS
Page 7: ...7 4 1 Machine dimensions JTM 1254VS and JTM 1254RVS Figure 4 1 Installation Diagram...
Page 8: ...8 4 2 Overview and terminology JTM 1254VS and JTM 1254RVS Figure 4 2 Overview...
Page 19: ...19 Figure 9 6...
Page 22: ...22 12 1 1 JTM 1254VS Upper Head Assembly Exploded View...
Page 26: ...26 12 2 1 JTM 1254RVS R8 Upper Head Assembly Exploded View...
Page 30: ...30 12 3 1 JTM 1254VS Lower Head Assembly Exploded View...
Page 34: ...34 12 4 1 JTM 1254RVS R8 Lower Head Assembly Exploded View...
Page 38: ...38 12 5 1 JTM 1254VS Base Machine Exploded View...
Page 41: ...41 12 6 1 JTM 1254RVS R8 Base Machine Exploded View...
Page 50: ...50 13 0 Electrical Connections JTM 1254VS RVS 230V Wiring Diagram 460V Wiring Diagram...
Page 52: ...52 427 New Sanford Road LaVergne Tennessee 37086 Phone 800 274 6848 www jettools com...