background image

 

5

Assembly Instructions 

Note:

  Some parts may come pre-installed. Refer 

to parts breakdown for numbers found in 
parentheses (#). Figure 1 shows provided 
fasteners. 

 

Figure 1 

1.  Install a caster assembly (05) to each short 

extension leg (03) with M8x20 screws (04), M8 
lock washers (06) and M8 hex nuts (07). 

2.  Slide short extension legs (03) into the rear 

support of base (01). Insert two M12x25 
screws (09) into threaded holes and tighten to 
hold legs in place. 

3.  Install a caster assembly (05) on each long 

extension leg (08) with M8x20 screws (04), M8 
lock washers (06) and M8 hex nuts (07). 

4.  Slide long extension legs (08) into front 

supports of base (01). Insert two M12x25 
screws (09) into threaded holes and tighten to 
hold legs in place. 

5.  Connect post (10) to base (01) with two 

M12x25 screws (09) and two M12 washers 
(61) into the threaded holes. 

Do not fully 

tighten yet

6.  Attach supports (11) to base (01) and top of 

post (10) using two M12x100 screws and two 
M12 nuts (15) at the bottom. At the top of the 
supports, install washers (25) and handles 
(24). Tighten the handles using a wrench on 
the flats. 

7.  Tighten the lower screws on the supports (11) 

and the post (01). 

8.  Connect boom (13) to post (10) using one 

M20x125 screw (14), one M20 nut (15), and 
two M20 washers (60). 

9.  Bolt lower portion of ram (21) to post (10) 

using one M16x100 screw (17), one M16 nut 
(18), and two M16 washers (60). 

10. Bolt upper portion of ram (21) to boom (13) 

using one M16x75 screw (22), one M16 nut 
(18), and two M16 washers (60). 

11. Slide boom extension (16) into boom (13). 

Insert adjustment pin (26) through one of the 
holes and secure with hitch pin (27). 

12. Install chain and load hook using M12x80 

screw (20), M12 hex nut (02) and M12 washer 
(61). 

13. Insert small covers (28) into short extension 

legs (03), long extension legs (08), and boom 
extension (16).  Insert big cover (29) into back 
end of boom (13). 

14. The pump handle (23) can be stored in the 

holder on the post (10) when not in use.   

Operation 

1.  Load to be lifted must be securely attached 

with slings or chain of adequate size and 
strength.  Before lifting the load, be sure load 
cannot twist, or fall from attachment. 

2.  Move crane into position. Legs must be 

extended out beyond the boom extension.  

3.  Close hydraulic valve at base of ram by 

inserting groove of pump handle onto release 
valve (45), and turning clockwise until tight. 

4.  Place slings or chains in center of hook and 

make sure safety latch is securely latched. 

5.  Slowly raise load to desired height by inserting 

handle into ram and pumping handle. Be 
careful to observe if the load wants to shift, 
and prevent load from rotating or swinging. 

6.  Move load to desired location by rolling crane 

assembly. Use caution so that load does not 
swing or rotate. 

7.  Carefully lower load to desired location by 

inserting ram handle onto release valve (45) at 
base of ram, and slowly turning counter-
clockwise. Do not lower too quickly, and 
confirm load is secure once lowered fully. 

 

 

Summary of Contents for JHC-200X

Page 1: ...l 2 Ton Hydraulic Shop Crane Model JHC 200X WALTER MEIER Manufacturing Inc 427 New Sanford Road LaVergne Tennessee 37086 Part No M 106200 Ph 800 274 6848 Revision C 09 2012 www waltermeier com Copyrig...

Page 2: ...ge prepaid to a location designated by us For the name of the location nearest you please call 1 800 274 6848 You must provide proof of initial purchase date and an explanation of the complaint must a...

Page 3: ...rning indicator line on each leg 11 Boom extension hardware must be secure before attempting to lift any load 12 Never place any part of the body under the load or crane while in use 13 Never use the...

Page 4: ...nding Walter Meier Manufacturing Inc reserves the right to effect at any time and without prior notice changes or alterations to parts fittings and accessory equipment deemed necessary for any reason...

Page 5: ...lt upper portion of ram 21 to boom 13 using one M16x75 screw 22 one M16 nut 18 and two M16 washers 60 11 Slide boom extension 16 into boom 13 Insert adjustment pin 26 through one of the holes and secu...

Page 6: ...rtment call 1 800 274 6848 Monday through Friday see our website for business hours www walteremeier com Having the Model Number and Serial Number of your machine available when you call will allow us...

Page 7: ...15 TS 1540121 Hex Nut M20 1 16 JHC200X 16 Boom Extension 1 17 JHC200X 17 Hex Cap Bolt M16 100 1 18 TS 1540101 Hex Nut M16 2 19 JHC200X 19 Load Hook w chain 1 20 TS 1499141 Hex Cap Bolt M12 80 1 21 JFH...

Page 8: ...8 Hydraulic Ram Exploded View...

Page 9: ...X 41 Seal Ring M81x4 1 42 JFHC200X 42 Tube 1 43 SB 6MM Steel Ball M6 1 44 JFHC200X 44 Seal Ring M88x6 1 45 JFHC200X 45 Release Valve 1 46 SB 6MM Steel Ball M6 2 47 JFHC200X 47 Copper Washer M18 2 48 J...

Page 10: ...10 This page intentionally left blank...

Page 11: ...11 This page intentionally left blank...

Page 12: ...12 WALTER MEIER Manufacturing Inc 427 New Sanford Road LaVergne Tennessee 37086 Phone 800 274 6848 www jettools com www waltermeier com...

Reviews: