21
11.6
Adjustment of half-nut guide
Loosen two nuts (1, Figure 36) on the right side of
the apron and adjust the set screws (2, Figure 36)
until both half nuts move freely without play. Tighten
both nuts.
11.7
Replacing the V-belt
Remove tension on the V-belt by pulling lever
toward front of the machine (Figure 37).
Remove belt from the pulley and replace with new
belt. Move lever toward motor to tension belt. Close
the cover.
Caution:
To avoid breaking the belt, move the
tension lever towards the front of the machine
before starting (Figure 38).
Figure 36
Figure 37
Figure 37
Figure 38
Summary of Contents for BDB-919
Page 25: ...25 13 2 1 Drive Belt Assembly Exploded View ...
Page 29: ...29 13 5 1 Electrical Exploded View ...
Page 32: ...32 13 7 1 Gear Box Exploded View ...
Page 35: ...35 13 8 1 Apron I Exploded View ...
Page 38: ...38 13 10 2 Saddle and Cross Slide Exploded View ...
Page 40: ...40 13 11 1 Compound Slide Exploded View ...
Page 42: ...42 13 12 1 Tailstock Exploded View ...
Page 46: ...46 13 15 1 BD 919 Bed Assembly Exploded View ...
Page 48: ...48 13 16 1 BDB 929 Bed Assembly Exploded View ...
Page 54: ...54 15 0 Speed and threading charts ...
Page 56: ...56 427 New Sanford Road LaVergne Tennessee 37086 Phone 800 274 6848 www jettools com ...