10
6.0
Setup and Assembly
WARNING:
Read and understand the entire contents of this manual
before attempting assembly or operation. Failure to comply
may cause serious injury.
6.1
Unpacking and clean up
Remove all contents from shipping crate and compare parts to
the contents list in this manual. If shipping damage or any part
shortages are identified, contact your distributor. Do not
discard crate or packing material until drill press is assembled
and running satisfactorily.
Clean all rust protected surfaces with kerosene or a light
solvent. Do not use lacquer thinner, paint thinner or gasoline,
as these can damage plastic components and painted surfaces.
6.2
Shipping contents
1
Machine
1
Cabinet stand (Optional)
1
Coolant facility (Optional)
1
Machine lamp(Optional)
1
100mm 3-jaw chuck
1
100mm 4-jaw chuck (Optional)
1
170mm Face plate 9Optional)
1
Chuck guard
1
4-way tool post
1
Tool post guard(
Optional)
1
Set of change gears
1
MT3 fixed centre
1
MT2 fixed centre
1
MT2 live centre (Optional)
1
Steady rest
(Optional)
1
Follow rest
(Optional)
1
Operating tools in tool box
1
Oil can
1
Operating instructions and parts manual
6.3
Assembly
The machine comes completely assembled.
Install the drive belt (V-belt).
Inspect that all fasteners are tight.
6.4
Initial lubrication
The machine must be serviced at all lubrication points before it is
placed into service (see chapter 11.1 for lubrication).
6.5
Installation
Unbolt the lathe from the shipping crate bottom.
Use heavy duty fibre belt for lifting the machine off the pallet.
Warning:
The machine is heavy (
85
kg)!
Assure the sufficient load capacity and proper condition of your
lifting devices.
Never step underneath suspended loads.
To avoid tipping, the machine must be bolted down with
two
anchor bolts (not provided).
To avoid twisting the bed, make sure the setup surface is
absolutely flat and level.
Loosen anchor bolts, shim and tighten bolts if needed.
The machine must be level to be accurate!
7.0
Electrical Connections
WARNING:
All electrical connections must be done by a qualified
electrician in compliance with all local codes and ordinances.
Failure to comply may result in serious injury.
The BD-8VS Metal Lathes are rated at
1~230V, PE, 50Hz
power
supply. The machines come with a plug designed for use on a
circuit with a
grounded outlet.
Mains connection and any extension cords and plugs used
must comply with the information on the machine license
plate.
The mains connection must have a 16A surge-proof fuse.
Only use extension cords marked H07RN-F, with wires 1,5mm
2
or more.
The total length of cord may not exceed 18 Meter
Power cords and plugs must be free from defects.
Connections and repairs to the electrical equipment may only
be carried out by qualified electricians.
The machine is equipped with 1.8m power cord and plug.
Before connecting to power source, be sure main switch is in
off position.
7.1
Grounding instructions
This tool must be grounded. In the event of a malfunction or
breakdown, grounding provides a path of least resistance for
electric current to reduce the risk of electric shock. This tool is
equipped with an electric cord having an equipment-
grounding conductor and a grounding plug. The plug must be
inserted into an appropriate outlet that is properly installed
and grounded in accordance with all local codes and
ordinances.
WARNING:
Improper connection of the equipment-grounding conductor
can result in a risk of electric shock. Check with a qualified
electrician or service person if you are in doubt as to whether
Summary of Contents for BD-8VS
Page 18: ...18 15 0 Replacement Parts BD 8VS Assembly Breakdown 1 ...
Page 20: ...20 BD 8VS Assembly Breakdown 2 ...
Page 22: ...22 BD 8VS Assembly Breakdown 3 ...
Page 24: ...24 BD 8VS Assembly Breakdown 4 ...
Page 26: ...26 BD 8VS Assembly Breakdown 5 ...
Page 28: ...28 BD 8VS Assembly Breakdown 6 ...
Page 30: ...30 BD 8VS Assembly Breakdown 7 ...
Page 32: ...32 BD 8VS Assembly Breakdown 8 ...
Page 34: ...34 BD 8VS Assembly Breakdown 9 ...
Page 36: ...36 16 0 Wiring Diagrams BD 8VS 1 230V PE 50Hz ...
Page 38: ...38 ...