6
Contents of Shipping Carton
1.
Air Filtration Unit
1.
Remote Control
2.
AAA Batteries
4.
Eye Bolts, Washers & Hex Nuts
1.
Manual and Warranty Card
Tools Required for Assembly
10 mm Wrench
•
The air filtration unit does not require much
assembly.
You
should
take
into
consideration how and where you will place
this unit.
•
This unit will work best if it is located away
from corners, and heating/cooling vents.
•
If using on sawhorses the air filtration unit
should be clamped in place.
•
This unit is specifically designed to circulate
and
filter
non-metallic
dust,
which
is
generated throughout the work area.
Assembly
CAUTION!
Mounts must be anchored to building
structure, which will support a minimum of
at least 220 pounds. Never mount to
surfaces such as dry wall or false ceiling
grids, etc.
1.
Remove all packing from inside of the
unit by opening the side panel.
2.
Make sure the hex nut (A, Fig. 1) is threaded
all the way up the eyebolt (B, Fig. 1).
3.
Place a flat washer (C, Fig.1) on the eye
bolt. Screw the eye bolt into the cabinet and
tighten hex nut against the cabinet top. You
will need to hold the eyebolt so it does not
spin while tightening the lock nut.
4.
Repeat steps for remaining three eyebolts.
Note: Make sure chain and ceiling hooks are
properly rated for hanging this unit. Hang unit
with a seven-foot clearance from the floor.
Summary of Contents for AFS-2000
Page 9: ...9 Parts Breakdown...