Jesco Lutz PVC GF-2 Operating Instructions Manual Download Page 10

Installation

Pump-side installation

10

© Lutz-Jesco GmbH 2016

BA-12204-01-V02

PVC GF-2 suction line

Operating instructions

6 Installation

The installation of the GF-2 suction line is performed in two steps. 
Chapter 6.1 „Pump-side installation“ on page 10 described the 
installation on the dosing pump, which is to be performed once. Chapter 
6.2 „Packaging side installation“ on page 10 describes the installation 
on the packaging which must be performed following every replacement 
of the packaging.

6.1  Pump-side installation

Note

No return with MAGDOS LDp 10 and 15!

A back-pressure valve is used when using the dosing pumps LDp 10 
and 15. The back-pressure valve does not involve any automatic 
backflow of the dosing medium. The installation of a backflow hose is 
not required when a back-pressure valve is used.

Precondition for action:

ü 

The dosing pump is not connected to the external power supply and 
is thus deactivated.

ü 

The operating instructions of the dosing pump is at hand.

ü 

A cutting tool is at hand.

Perform the following working steps:

1. 

Cut the hose (included) into three sections. Select the lengths in 
accordance with the distance between the dosing pump and the 
delivery packaging. Ensure that the cutting edges are straight.

Three fitting hose pieces are available for the connection of the 
suction line and the dosing pump.

2. 

Connect the suction connection (pos. 1) with the "valve and 
connection suction side" of the dosing pump and tighten all union 
nuts by hand.

3. 

Connect the connecting spout 2 (pos. 3) with the "air connection" of 
the dosing pump.

4. 

Connect the connecting spout 1 (pos. 2) with the "safety valve" of the 
PENTABLOC. 
This step is not required when using a back-pressure valve on the 
dosing pumps MAGDOS LDp 10 and 15. The installation of a backflow 
hose is unnecessary.

5. 

Connect the cable connection (pos. 4) with the "connection ports" on 
the fore side of the dosing pump and tighten all union nuts by hand.

6. 

Check whether all connections have been made correctly and 
improve if necessary.

ü 

The GF-2 suction line was successfully installed on the dosing 

pump.

6.2  Packaging side installation

Precondition for action:

ü 

The safety equipment in accordance with chapter  „Personal 
protective equipment“ on page 6 is used.

ü 

The dosing pump is not connected to the external power supply and 
is thus deactivated.

ü 

Chapter 6.1 „Pump-side installation“ on page 10  was performed 
successfully.

Perform the following working steps:

1. 

Open the sealing cover of the packaging and slide the suction line 
into the packaging until it lies on the undissolved granulate and does 
not get stuck in the granulate.

2. 

Fix the suction line on the cover using the two O-rings.

3. 

Tighten the K60x6 cover hand tight.

ü 

The GF-2 suction line was installed in the packaging success-

fully.

Summary of Contents for Lutz PVC GF-2

Page 1: ...ns Lutz Jesco GmbH 2016 BA 12204 01 V02 PVC GF 2 suction line Operating instructions Read the operating manual The user is responsible for installation and operation related mistakes Dosing Conveying...

Page 2: ......

Page 3: ...s 4 1 3 Explanation of the warning signs 4 1 4 Identification of warnings 4 1 5 Instruction for action identification 5 1 6 General safety precautions 5 2 General 6 3 Intended use 7 4 Product descript...

Page 4: ...this operating manual Signal words illustrate the gravity of possible injuries if the risk is ignored Signal word Meaning DANGER Refers to imminent danger Ignoring this sign may lead to death or the m...

Page 5: ...p with no follow up action 1 First step in a series of steps 2 Second step in a series of steps 4 Result of the above action Action completed aim achieved 1 6 General safety precautions WARNING Chemic...

Page 6: ...g level of the packaging is too low Personal protective equipment Based on the degree of risk posed by the dosing medium and the type of work you are carrying out you must use corresponding protective...

Page 7: ...ion line serves the safe removal of the dosing medium from a delivery package level monitoring of the packaging and the safe return of the dosing medium should the safety equipment be activated automa...

Page 8: ...4 1 Scope of delivery Please compare the delivery note with the scope of delivery The following items are part of the scope of delivery n Suction line inc K60x6 cover n Hose 5 m 4 2 Design Fig 1 Desi...

Page 9: ...minal diameter DN 4 Capacity up to 25 l h Hose 4 mm Max ambient temperature 5 40 C Max temperature of the medium 35 C Electrical load capacity of the level monitoring Umax 50 V DC 50 V AC Imax 0 5 A P...

Page 10: ...the connection of the suction line and the dosing pump 2 Connect the suction connection pos 1 with the valve and connection suction side of the dosing pump and tighten all union nuts by hand 3 Connect...

Page 11: ...ered if the suction line level monitoring system GF 2 is triggered If the dosing pump is stopped by the level monitoring system this can only be read on the dosing pump display The GF 2 suction line s...

Page 12: ...ce 12 Lutz Jesco GmbH 2016 BA 12204 01 V02 PVC GF 2 suction line Operating instructions 8 Maintenance Maintenance work to be carried out Frequency Visual inspection With use daily Table 5 Maintenance...

Page 13: ...eason for repair Dosing medium Description Irritating Yes No Properties Corrosive Yes No We hereby certify that the product has been cleaned thoroughly inside and outside before returning that it is f...

Page 14: ...any Phone Date Address Contact person Manufacturer order no Date of delivery Device type Serial number Nominal capacity nominal pressure Description of fault Service conditions of the device Point of...

Page 15: ......

Page 16: ......

Reviews: