INSTALLATION MANUAL
ZPS-
K5.3,
K10.3, K20.3 CLAMPING
MODULE WITH SENSOR
MONITORING, MOUNTING FLANGE
877.426.2504
SUBJECT TO TECHNICAL CHANGES.
JERGENS INC. · PHONE: 216.486.5540 · FAX: 216.481.6193 /553720 / 553721/
12
Clamping procedure
:
Depressurise ZPS.
The ZPS locks positively and is mechanically clamped by
spring force. The ZPS will remain closed as long as no
pressure is applied to the Open connection. Pressure line
can be decoupled after the clamping process – the ZPS
remains positively interlocked and self-locking.
CAUTION:
Do not reach into the Zero Point System
Manual blow-out
:
The interior of the ZPS can be blown out
with an ordinary commercial compressed
air blow gun or suctioned out with a vacuum
device.
During operation, there is danger of eye
injury, since shavings can arise from the
blow-out.
CAUTION:
Wear safety goggles