Jeremias HT 103 Installation Instructions Manual Download Page 1

 

Jeremias INSTALL_HT

 

Rev: 3/26/19

 

 
 
 
 
 

Type HT Chimney 

UL Listed to: 

 

UL 103 HT Factory-Built Chimneys for Residential Type and Building Heating Appliances 

 

CAN/ULC-S604 STANDARD FOR FACTORY- BUILT TYPE A CHIMNEYS 

 
Model HT - Double Wall 1

” Fiber Insulation

 

Installation Instructions 

A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED 
CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS.  IT IS OF UTMOST IMPORTANCE 
THAT THIS CHIMNEY BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS.

  

 

        
 
                                                                           

 
 
 
 
 

 
 

 

 
 

 
 
 

 

     
                                                                                                             

                                                            

Important:  Read all instructions before beginning to install.  Failure to comply with these instructions may result in 
a hazardous installation resulting in injury or damage to property.  An improper installation will void the 

manufacturer’s warranty

.   

 
Keep these instructions for future reference. 
                                   

For Technical Support or more product information please contact us at 678-388-2740 or visit our website at 

www.jeremiasinc.com 

 

Summary of Contents for HT 103

Page 1: ...IR SPACES TO COMBUSTIBLE MATERIALS IT IS OF UTMOST IMPORTANCE THAT THIS CHIMNEY BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS Important Read all instructions before beginning to install Fail...

Page 2: ...unique design which leaves no destructive heat bridge between inners and outers and a strong simple locking band design which makes for easy assembly Certification by Underwriters Laboratory and a be...

Page 3: ...creosote The creosote vapors condense in the relatively cool chimney flue of a slow burning fire As a result creosote residue accumulates on the flue lining When ignited this creosote makes an extrem...

Page 4: ...rements Component 5 Diameter 6 Diameter 7 Diameter 8 Diameter Ceiling Support Round or Square 11 x 11 12 x 12 13 x 13 14 x 14 Wall Thimble 11 x 11 12 x 12 13 x 13 14 x 14 Firestop Radiation Shield 11...

Page 5: ...Locking Band so that the number etching is right side up When viewing the worm gear straight on the nut is to the left With the worm gear rotated to away from sight the nut can be accessed with a scre...

Page 6: ...ceiling in the room above where the appliance is located To install See Fig 8 7 9 29 1 Determine the location where the chimney will pass through the ceiling Plan the system to avoid obstructions such...

Page 7: ...the 1st length of chimney pipe Refer to Joint Assembly section 8 Lower Chimney Adapter and Chimney Pipe assembly down into the Ceiling Support Align and engage the single wall tube of the Chimney ada...

Page 8: ...14 15 1 Determine the location where the chimney will pass through the wall Plan the system to avoid obstructions such as electrical plumbing and studs 2 Cut a hole in the wall and build a framed in...

Page 9: ...nded Brackets and support 2 Use supplied fasteners to bolt Wall Brackets to TS in the desired position above or below the TS 3 Position the Tee Support against the wall it will be mounted to The plate...

Page 10: ...on Anchor Plate AP The Anchor Plate AP connects a masonry fireplace or a factory built fireplace to Jeremias HT chimney To Install For Masonry fireplace see Fig 20 1 Follow the requirements of the loc...

Page 11: ...ng To Install See Fig 22 23 1 Establish the correct framing dimension See Table 2 2 From the underside of the ceiling position the cylinder of the FRS inside the framed opening and with the plate flat...

Page 12: ...llar is used to seal off the opening between the vent and flashing To Install See Fig 25 1 Position Storm Collar around vent and against the opening of the flashing 2 Tighten worm gear to secure Storm...

Page 13: ...d has captured the bead Confirm all clearances and support spacing is correct Remove any protective film or packaging materials from chimney components Important Notice The UL listing for this product...

Page 14: ...14 Jeremias INSTALL_HT Rev 3 26 19 Fig 30 TEE SUPPORT INSTALLATION Fig 29 CEILING SUPPORT INSTALLATION...

Page 15: ...sture level does not exceed 20 or burning of chipboard or domestic waste IV Remedies If a valid Limited Warranty claim arises Jeremias shall it its sole discretion either repair the Product or deliver...

Page 16: ...16 Jeremias INSTALL_HT Rev 3 26 19...

Reviews: