
8
Non-Vented (recirculating) Installations
1. Connect the deflector to the vent cover bracket using 4 - 3.5
x 9.5 sheet metal screws provided.
Complete Preparation
1. Determine and make all necessary cuts in the wall for the vent
system. Install the vent system before installing the hood. See
“Venting Requirements” section.
2. Determine the required height for the home power supply
cable and drill a 1¼" (3.2 cm) hole at this location.
3. Run wire through the home power supply cable according to
the National Electrical Code or CSA Standards and local
codes and ordinances. There must be enough ½" conduit
and wires from the fused disconnect (or circuit breaker) box
to make the connection in the hood’s electrical terminal box.
NOTE: Do not reconnect power until installation is complete.
4. Use caulk to seal all openings.
Install Range Hood
1. Using 2 or more people, hang range hood on 2 mounting
hooks through the rectangular cutouts on back of hood.
2. Level the hood with leveling screws in mounting hooks or
rectangular cutouts, using a level across bottom of hood.
3. Secure hood with 4 screws through remaining 4 holes in
hood.
Connect Vent System
1. Install transition on top of hood (if removed for shipping) with
4 - 3.5 x 9.5 mm sheet metal screws.
A. Vent cover bracket
B. 3.5 x 9.5 mm sheet metal screws
A
B
A. Mounting hooks
B. 5 x 35 mm mounting screws
C. Leveling screws
D. Centerline on wall
A. Vent transition
B. 3.5 x 9.5 mm screw
WARNING
Excessive Weight Hazard
Use two or more people to move and install
range hood.
Failure to do so can result in back or other injury.
A
B
B
C
D
A
B
B