W H Y W E L O V E
J E N N A I R I N S T A L L E R S
THEY’RE TOTAL PROFESSIONALS (AND PERFECTIONISTS).
It’s all about getting that seamless flush execution, that down-to-the-
millimeter adjustment. Flawless installation is incredibly important to
the function, appearance and lifetime enjoyment of our products, and
our installers make it happen every day.
THEY DO THEIR HOMEWORK. AND HELP US WITH OURS.
These experts know JennAir
®
products inside and out. They train
extensively on JennAir installation, learning the latest techniques and
insider tips so they can install our cutting edge appliances with ease.
And we value their input, incorporating installer feedback to refine and
perfect our installations.
THEY THINK THROUGH EVERY DETAIL OF THE EXPERIENCE.
Above and beyond dedication is the baseline. The JennAir experience
starts the minute an installer brings the customer’s column home.
Keeping the site spotless, taking extreme care with both the appliances
and the home and providing an unforgettable introduction to columns
is all part of the game plan.
4
I N T R O D U C T I O N
Summary of Contents for JBZFR18IGX
Page 16: ...16 1 c u P R E P A R A T I O N...
Page 21: ...2 u P R E P A R A T I O N 21...
Page 27: ...27 2 11 2 TAPE WATER LINE TO FLOOR FURNITURE PREPARATION...
Page 28: ...3 c u I N S T A L L A T I O N 28...
Page 29: ...29 3 1 SWITCH COLUMN OFF 3 COLUMN INSTALLATION BEFORE PLUGGING IN COLUMN READ WARNING...
Page 36: ...4 36 C O L U M N P R E P A R A T I O N...
Page 40: ...TOE KICK COLUMN PREPARATION 4 4 7 TURN POWER ON 40...
Page 42: ...42 5 C U S T O M W O O D P R E P A R A T I O N 42...
Page 45: ...TOE KICK CUSTOM WOOD PREPARATION 5 5 5 ADHERE GRIPPING PADS TO POINTS 45...
Page 46: ...46 6 S T A I N L E S S S T E E L P R E P A R A T I O N 46 46...
Page 48: ...TOE KICK STAINLESS STEEL PREPARATION 6 3 AT TACH BLUE TOE KICK AND COLUMN WIRES 6 48...
Page 49: ...49 7 A L I G N M E N T A N D I N S T A L L A T I O N 49...
Page 53: ...TOE KICK ALIGNMENT AND INSTALLATION 7 7 7 CONFIRM ALIGNMENT READJUSTING IF NECESSARY 53...
Page 55: ...55 8 p N C U S T O M W O O D P R E P A R A T I O N 55...
Page 60: ...60 9 p N S T A I N L E S S S T E E L P R E P A R A T I O N 60...
Page 63: ...63 10 p N H A N G I N G A N D A D J U S T M E N T 63...
Page 69: ...10 11 REINSTALL BRACKET TRIMS PANEL HANGING AND ADJUSTMENT 69 10...
Page 70: ...70 11 o l I N S T A L L A T I O N 70...
Page 89: ...89 1 P R P A R A T I O N D E L A P P A E I L...
Page 94: ...2 94 P R P A R A T I O N D U M E U B L E...
Page 100: ...100 2 11 2 COLLER LE TUYAU D EAU AU PL ANCHER PR PARATION DU MEUBLE...
Page 101: ...3 101 I N S T A L L A T I O N D E L A P P A E I L...
Page 109: ...4 109 P R P A R A T I O N D E L A P L I N T H E D E L A P P A R E I L...
Page 113: ...PR PARATION DE LA PLINTHE DE L APPAREIL 4 4 7 MET TRE L APPAREIL SOUS TENSION 113...
Page 115: ...115 5 115 P R P A R A T I O N D E L A P L I N T H E E N B O I S P E R S O N N A L I S...
Page 119: ...119 6 119 119 P R P A R A T I O N D E L A P L I N T H E E N A C I E R I N O X Y D A B L E...
Page 122: ...122 7 122 A L I G N E M E N T E T I N S T A L L A T I O N D E L A P L I N T H E...
Page 126: ...ALIGNEMENT ET INSTALLATION DE LA PLINTHE 7 7 7 CONFIRMER L ALIGNEMENT REPL ACER AU BESOIN 126...
Page 128: ...128 8 128 P R P A R A T I O N D U P A N N E A U E N B O I S P E R S O N N A L I S...
Page 133: ...133 9 133 P R P A R A T I O N D U P A N N E A U E N A C I E R I N O X Y D A B L E...
Page 136: ...136 10 136 S U S P E N S I O N E T A J U S T E M E N T D U P A N N E A U...
Page 142: ...10 11 R INSTALLER LES GARNITURES DE SUPPORT SUSPENSION ET AJUSTEMENT DU PANNEAU 142 10...
Page 143: ...143 11 143 T E R M I N E R L I N S T A L L A T I O N...
Page 149: ...N O T E S 149...
Page 150: ...N O T E S 150...
Page 151: ...N O T E S 151...