115
F I N A L C H E C K
All packaging removed from the residence
Columns plugged in, powered on and operating
at peak performance
Columns leveled
Panels aligned and rechecked after 20
minutes operation
Water supplies properly connected
with no leaks
Water filters installed (not applicable with
reverse osmosis system)
Water dispensers and/or ice makers working
Any problems with installation or parts reported
to JennAir Epicenter
OW N E R WA L KT H R O U G H
If the owner is present, provide them with the
User Guide. Guide the owner through:
Control panel functions
App and WiFi setup
Discarding first few batches of ice
Replacing the water filters
Registering their columns
How to contact JennAir Epicenter through
jennair.com or at 1-800-JENNAIR (536-6247)
Summary of Contents for JBRFL24IGX
Page 24: ...24 1 C O L U M N S ...
Page 31: ...31 2 J O I N K I T ...
Page 36: ...36 3 P O S I T I O N I N G B R A C K E T ...
Page 39: ...39 4 b D s S B R A C K E T I N S T A L L A T I O N ...
Page 47: ...47 4 15 COMPLETE 4 2 4 11 1 2 3 4 BADASS BRACKET INSTALLATION ...
Page 48: ...48 5 F U R N I T U R E ...
Page 54: ...54 6 f I R S C O L U M N I N S T A L L A T I O N ...
Page 63: ...63 6 15 READJUST COLUMN SO THAT ALL DEPTHS MATCH 1 2 3 6 FIRST COLUMN INSTALLATION ...
Page 64: ...64 7 o N D C O L U M N I N S T A L L A T I O N ...
Page 71: ...71 7 11 I F I N S T A L L I N G O N L Y T W O C O L U M N S G O T O S E C T I O N 9 ...
Page 72: ...72 8 t H I R D C O L U M N I N S T A L L A T I O N ...
Page 80: ...80 9 p R E C O L U M N S F O R U S E ...
Page 84: ...84 9 7 EACH COLUMN TURN POWER ON 1 2 3 PREPARE COLUMNS FOR USE 9 ...
Page 86: ...86 10 t o e I c k C U S T O M W O O D P R E P A R A T I O N ...
Page 89: ...89 11 t o e I c k S T A I N L E S S S T E E L P R E P A R A T I O N ...
Page 91: ...91 11 3 AT TACH BLUE TOE KICK AND COLUMN WIRES 1 2 3 11 TOE KICK STAINLESS STEEL PREPARATION ...
Page 92: ...92 12 t o e I c k A L I G N A N D I N S T A L L ...
Page 97: ...97 13 A L C U S T O M W O O D P R E P A R A T I O N ...
Page 102: ...102 14 A L S T A I N L E S S S T E E L P R E P A R A T I O N ...
Page 105: ...105 15 A L H A N G A N D A L I G N ...
Page 111: ...111 15 11 EACH COLUMN REINSTALL BRACKET TRIMS 1 2 3 15 PANEL HANG AND ALIGN ...
Page 112: ...16 c p l t I N S T A L L A T I O N ...
Page 138: ...138 1 P R E PA R AT I O N D E L A P P A R E I L ...
Page 145: ...145 2 P R E PA R AT I O N D E L A T R O U S S E D E J O I N T ...
Page 150: ...150 3 P R E PA R AT I O N D E L A B R I D E D E P O S I T I O N N E M E N T ...
Page 153: ...153 4 I N S T A L L A T I O N D E L A B R I D E B A D A S S ...
Page 161: ...161 4 15 EFFECTUER LES ÉTAPES 4 2 À 4 11 1 2 3 4 INSTALLATION DE LA BRIDE BADASS ...
Page 162: ...162 5 P R E PA R AT I O N D U M E U B L E ...
Page 168: ...168 6 I N S T A L L A T I O N D U P R E M I E R A P P A R E I L ...
Page 178: ...178 7 I N S T A L L A T I O N D U D E U X I E M E A P P A R E I L ...
Page 185: ...185 7 11 SI SEULEMENT DEUX APPAREILS SONT INSTALLÉS PASSER À LA SECTION 9 ...
Page 186: ...186 8 I N S T A L L A T I O N D U T R O I S I E M E A P P A R E I L ...
Page 194: ...194 9 P R E PA R AT I O N D E L A P P A R E I L P O U R S O N U T I L I S A T I O N ...
Page 200: ...200 10 P R É P A R A T I O N D E L A P L I N T H E E N B O I S P E R S O N N A L I S É E ...
Page 203: ...203 11 P R É P A R A T I O N D E L A P L I N T H E E N A C I E R I N O X Y D A B L E ...
Page 206: ...206 12 A L I G N E M E N T E T I N S T A L L A T I O N D E L A P L I N T H E ...
Page 211: ...211 13 P R É P A R A T I O N D U P A N N E A U D E B O I S P E R S O N N A L I S É ...
Page 216: ...216 216 14 P R É P A R A T I O N D U P A N N E A U E N A C I E R I N O X Y D A B L E ...
Page 219: ...219 219 15 S U S P E N S I O N E T A L I G N E M E N T D U P A N N E A U ...
Page 226: ...226 16 T E R M I N E R L I N S T A L L A T I O N ...
Page 230: ...230 N O T E S ...
Page 231: ...231 N O T E S ...