WE ARE HERE TO SURPRISE
9
3. Installation instructions
3.1 Preparations before installation
3.1.1 Tools and equipments needed
√ Electrical drill
√ Open wrenches
√ Screw drivers
√ Adjustable spanners
√Inner hexagon spanners
3.1.2 List for parts checking ---Annex 1
(
Packing list
)
Unfold the package and check if any parts missed as per Annex 1. Do not hesitate to contact us in case any parts missed, but if
you do not contact us and insist installing upon the lack of some parts,
JEMA AUTOLIFTE
as well as our dealers will not bear
any responsibility for this and will charge for any parts subsequently demanded by the buyer.
3.1.3 Ground conditions
The lift should be fixed on a smooth and solid concrete ground with its strength more than 3000psi, tolerance of flatness less
than 5mm and minimum thickness of 200mm. In addition, newly built concrete ground must undergo more than 28days
’ cure
and reinforcement.
3.2 Precautions for installation
3.2.1 Joints of oil hose must be firmly connected in order to avoid leakage.
3.2.2 All bolts should be firmly screwed up.
3.2.3 Do not place any vehicle on the lift in the case of trial running.
3.3 Installation
Step 1:
Remove the packaging and take the two mechanical assemblies and the control box to the designated
installing place. Please do read and understand this manual thoroughly before next step.
Step 2: Connect the oil hose to the pump assembly with a proper wrench, it has no effect which side the oil hoses are
connected to.
( Make sure the hose end is clean).