![JEI DRILLING & CUTTING SOLUTIONS RAILBEAST RDE-36 Operator'S Manual Download Page 17](http://html.mh-extra.com/html/jei-drilling-and-cutting-solutions/railbeast-rde-36/railbeast-rde-36_operators-manual_641790017.webp)
WWW.JEIUK.COM
RAILBEAST ELECTRIC RDE-36
This document is protected by copyrights.
Copying, using, or distributing without permission of Ansa Group Ltd is prohibited.
17
Make sure that the bar of the frame is between the pin and the fitting (
1
). Connect the
cooling system with the adapter to the fitting (
2, 3
). Open the valve (
4
). Next, turn the
handle (
5
). Move the handle up-down several times to increase the pressure in the
bottle.
To remove, close the valve (
4
). Pull up the release valve (
6
) to release excess
pressure, and then pull out the adapter from the fitting.
6
3
2
4
5
1