
Installation Cont.
5
Step 3
Step 4
Place the top shell on the bottom shell, being sure
to line them up so that all four lock cams go through
the bottom shell openings.
Lock only one side of the carrier before positioning
it on the cross rails. Depending on which side you
prefer to load the carrier. Place the opposite side
locks into the locked position which will now become
the locked hinge side.
Set cross rails at 24” on center. (See Note)
Cargo carrier should be pointed in the same direction
as the front of the vehicle.
Note:
Cross rails on some vehicles are not adjustable
and may require additional holes drilled into the
bottom of the cargo carrier to match the fixed position
width. If this is the case, attach the cargo carrier to
the rear cross rails first, using the pre-drilled holes.
Then drill holes in the front of the cargo carrier using
the mounting back plate (#4) as a template for the
hole positions. Drill marks are 2 in. apart and pre-
drilled to 24 in. on center spacing. Use drill marks
for your application.
24 in. Spacing
Bottom Shell Openings
Correct lock cam in slot