background image

Current instructions at www.jeco-inc.com.com  

1-800-893-3006

                  Page 3 of 4

 

 

Step 1:

 Loosely attach 1 x leg (G) to 2 x leg frame (H) with 4 x bolts (AA) and 4 x nuts (DD). Repeat with second 

leg (G) with remaining 4 x bolts (AA) and 4 x nuts (DD)

 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     

                                  

Step 2: 

Turn the slate top (F) upside down on a soft surface and attach leg frame structure using 4 x bolts (BB). 

Tighten all fixings. 

 

 

 

 
 
 
                           

 

 
 
 
 
 
 
 

 

Step 3:

 Insert the handle (A) into the mesh cover (B) and secure using 1 x nut (DD) underneath.

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

Reviews: