Jeco FCL147 Instructions Download Page 3

Current instructions at www.jeco-inc.com  

1-800-893-3006

                  Page 3 of 4

 

Step 4:  

Attach the metal flamingo (D) to the bottom rock (B). 

 

 
 
 
 
 
 
 
 

Step 5:  

Fill the basin (B) with clean water, making sure the pump (E) is fully submerged.

 

Note: 

The maximum water level should be approximately 1.2 inches below the top edge of 

the basin (B). 

 
 
 
 
 
 
 
 
 

 
Step 6: 

 Finally, connect the plug of pump (E) to a GFCI outlet. 

WARNING:

 Always disconnect the pump (E) before placing your hands in the water. 

 
 
 
 
 
 
 
 
 
 

Reviews: