25
2- REDUCTION GEAR
The oil change of all gearboxes should be carried out
at least once a year
, depending on the
frequency of use of the equipment:
3 - WHEELS
1.
Fixing: Check tightness of wheels regularly and after having used the equipment for
10
hours
.
2.
Inflation: Follow the instructions on the stickers and regularly check the pressure.
3.
Check the pressure of tyres when the equipment is delivered. The pressure should then
be checked after every ten hours of work. When controlling the pressure, also check the
treads and sides of tyres. A damaged tyre should be immediately changed.
4.
Warning! Inflating or changing tyres can be dangerous!
Use adapted and safe tools or call in a specialist.
4- BRAKING:
Regularly check:
The surface condition of cables
The tighteness of the cable clamps
The cable tension
The thickness of the drum brake lining
Rep
Item
Pos.n
r
Type
Type
Typen
Boîtes d'engrenages / Gear boxes / Getriebekasten
Huile Oil Ol
N°
Monté sur
Fitted on
Auf
Litres Liter Liter
COMER GB
Qté Qty
Menge
1
2-speed
reduction gear
with 1 vertical
beater
814 192
Traverse AV
Front
crossbar
5.6
indicator
5.6
SAE 90
2
2-speed
reduction gear
with 2 vertical
beaters
814 194
Traverse AV
Front
crossbar
9.2
indicator
13
indicat
or
SAE 90
3
Planetary
reduction gear
814 191
Sous vis verticale
Under vertical
beater
17.4
supplier
13.8
plate
SAE 90
4
Planetary
reduction gear
814 198
Sous vis verticale
Under vertical
beater
17.2
supplier
13.8
plate
SAE 90
Summary of Contents for MVV 9
Page 11: ...11 2 Stowing diagram...