- 54 -
Maintenance of watertight batteries
- This type of battery needs no maintenance and does not produce any gas during normal use.
No ventilation is needed.
- The optimum temperature for use is between 10 degree C and 30 degrees C. Lower
temperatures will reduce the available capacity. Higher temperatures will increase the
batteries' self-discharge rate.
- Never open watertight batteries.
- Never add acid or distilled water.
- The pressure valves are used to seal the batteries and cannot be opened without being
destroyed.
- If the batteries overheat, a build-up of gas may develop: Keep away from the batteries.
7.2.2 Battery switch
- Manual battery switches: to make the system live, manually turn the positive and negative
battery isolator switches.
Location: Companionway
1. Battery breaker - "positive terminal - engine"
- Port side
2. Battery breaker - "positive terminal - engine"
- Starboard
3. Battery switch "common negative"
4. Battery switch "service positive"
- Turn off all battery breakers before leaving the vessel:
risk of complete
discharging of whole battery bank
.
- Avoid touching the battery breakers when they are live.
- Never switch off the battery breakers when the boat's engine is running (risk
of serious damage to the charging circuit).
Summary of Contents for Velasco 37 F
Page 1: ...VELASCO 37 F OWNER S MANUAL 162541 Index A...
Page 2: ......
Page 10: ......
Page 16: ...16 3 2 ACCESS TO THE BOAT Access to the cockpit Access Wheelhouse Side Holding...
Page 17: ...17 Access to the engine compartment Access Cockpit locker Access Cave 3 STABILITY AND BUOYANCY...
Page 23: ...23 4 1 3 Windscreen washer Reservoir location Cave Control Steering station 4 MANOEUVRABILITY...
Page 26: ......
Page 38: ......
Page 58: ...58 7 2 6 Layout of the wiring looms in the hull DC circuit 00...
Page 59: ...59 7 2 7 Layout of the deck wiring looms DC circuit 7 DC INSTALLATION...
Page 78: ...78 7 3 1 AC shore socket location of components...
Page 82: ...82 7 3 3 Bundles installation Hull AC circuit 1 2 3 2 2 3 2 2 4...
Page 83: ...83 7 3 4 Bundles installation Deck AC circuit 7 1 3 2 3 5 2 2 AC SYSTEM...
Page 89: ...89 Cooker Oven Battery support System PIEZO 8 LIQUEFIED PETROLEUM GAS LPG SYSTEM LPG...
Page 94: ......