35/106
MOORING LINES
A sufficient number of mooring lines suitably sized and suitable for the
environment shall be on board for mooring your boat.
- Always manoeuvre your boat using the engine.
- Make allowance for the current and wind when you handle your boat.
- Protect your boat to the highest degree with suitably sized fenders.
- Always keep the mooring ropes unfouled and stored away.
- Handle your boat at a reduced speed.
AFTER MOORING
- Protect the mooring lines against chafing with plastic sleeves.
- Make allowance for the variations in tides if need be.
TOWING
TOWING BOAT
- Tow another boat at a reduced speed and as smoothly as you can.
- Pay particular attention when you throw or catch the towing rope (it may foul on the
propeller).
Note: The stability may be reduced when you tow a boat.
TOWED BOAT
Keep steering your boat and see to it that you stay in the wake of the towing boat.
Inappropriate towing can damage your vessel, do not tow at more than 6 knots.
DANGER
- Wear your life jacket.
- In heavy weather, wear your safety harness and fasten yourself to the
boat.
- When at sea close the guardrail side-opening or openings.
- Do not try to stop the boat using a boat hook or your foot, your hand or
any other part of the body.
4
DECK
Summary of Contents for MERRY FISHER 755
Page 1: ...MERRY FISHER 755 OWNER S MANUAL 982813 Index E...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 29: ...25 106 BILGE PUMP SYSTEM LOCATION 2 1 2 3 4 12 13 5 6 7 8 9 10 11 SAFETY...
Page 33: ...29 106 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 36: ......
Page 44: ......
Page 48: ......
Page 49: ...45 106 STEERING SYSTEM STEERING GEAR 5...
Page 52: ......
Page 53: ...49 106 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 6...
Page 54: ...50 106 INTRODUCTION DECK SALOON INTERIOR ACCOMMODATION...
Page 56: ......
Page 58: ......
Page 69: ...65 106 ELECTRICAL EQUIPMENT 12 V CIRCUIT DC ELECTRICAL CIRCUIT 110 220 V EQUIPMENT 8...
Page 75: ...71 106 LOCATION BATTERY SWITCH Battery switch Positive 8 ELECTRICAL EQUIPMENT...
Page 78: ...74 106 ELECTRICITY LOCATION P 9 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22...
Page 84: ......
Page 85: ...81 106 ENGINE GENERAL INFORMATION ENGINE FITTING 9...
Page 96: ......
Page 97: ...93 106 LAUNCHING LAUNCHING RECOMMENDATIONS 10...
Page 98: ...94 106 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm 1000 3400...
Page 100: ......
Page 101: ...97 106 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 104: ......
Page 105: ...101 106 APPENDIXES CERTIFICATES OF STANDARDS EPA 12...
Page 109: ...105 106 12 APPENDIXES...
Page 110: ...106 106...