58/98
WATER SYSTEM - DRAINAGE
OPERATION
Waste water from the sink, washbasins and heads is drained off by thru-hull fittings with
ball valves (the valve is closed when the valve handle is perpendicular to the hose, the
valve is open when the valve handle is in line with the hose).
All the floors have holes (limber holes) for the water flow.
A main sump located above the ballast receives water from the bilges.
The main sump is partially drained by an electric or a manual pump. Regularly dry the sump
with a sponge.
USE OF WASHBASIN
Close the valves and turn off the taps after use.
THRU-HULL FITTING CLOSED
THRU-HULL FITTING OPEN
Drainage Galley sink
Washbasin draining Head version
Summary of Contents for MERRY FISHER 725 HB
Page 1: ...MERRY FISHER 725 HB OWNER S MANUAL S PORTS ET LOISIRS 084971 Index G...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 24: ......
Page 26: ...22 98 SUPPLY VALVE FUEL LOCATION ON THE FUEL TANK...
Page 31: ...27 98 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 34: ......
Page 44: ......
Page 45: ...41 98 STEERING SYSTEM STEERING GEAR 5...
Page 46: ...42 98...
Page 48: ......
Page 49: ...45 98 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 6...
Page 50: ...46 98 INTRODUCTION SALOON DECK INTERIOR...
Page 52: ...48 98 Opening Closure Fridge door unlock Fixed saloon berth system Berth fixing...
Page 54: ......
Page 56: ...52 98 GENERAL WATER DIAGRAM...
Page 58: ...54 98 WATER TANK FLEXIBLE WATER TANK 100 L...
Page 68: ......
Page 69: ...65 98 ELECTRICAL EQUIPMENT 12 V DC SYSTEM EQUIPMENT 8...
Page 70: ......
Page 72: ...68 98 SCHEMATIC DIAGRAM 12 V...
Page 75: ...71 98 ACCESS TO FUSES Through the washroom panel Behind the wheelhouse 8 ELECTRICAL EQUIPMENT...
Page 76: ......
Page 81: ...77 98 ENGINE GENERAL INFORMATION ENGINE FITTING 9...
Page 84: ...80 98 ENGINE FITTING...
Page 86: ......
Page 93: ...89 98 LAUNCHING LAUNCHING RECOMMENDATIONS 10...
Page 94: ...90 98 POSITIONING OF HOISTING STRAPS AND SADDLES Note Measurements are expressed in mm...
Page 97: ...93 98 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 100: ......
Page 102: ......