95/102
LAUNCHING RECOMMENDATIONS
A lot of skill and care is required to commission your JEANNEAU boat. The
proper working of all your boat's equipment is the result of the quality of the commissioning
operations.
In order to remain completely under guarantee in the case of any failure of parts or
materials the first launching and the first trials of different equipment must be carried out
by your JEANNEAU dealer.
If later you have to launch your boat yourself, you should take the following precautions:
BEFORE LAUNCHING
- If your boat is to be fitted with sounder and speedometer, allow for the relevant fittings
and their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine manual).
- Turn off the engine cooling water drain valves.
- Retract the speedometer into its housing (it may be damaged by the handling belts).
- The anode shall not be painted.
- Turn off all the water inlet and drain valves (sink, washbasin, heads, engine).
HANDLING
- Install a fore rope, a rear rope and fenders.
- When craning, check that no device is crushed by the belts (sounder, speedometer,
shaft, etc.).
- Locate the strap positions using the stick-on markers. The belt position will be useful
during the craning for a future launching.
WARNING
- Do not stay on board or under the boat during hoisting.
ADVICE - RECOMMENDATION
- The proper working of all your boat's equipment is the result of the quality of the
commissioning operations.
10
L
A
U
N
C
H
IN
G
Summary of Contents for LEADER 9
Page 1: ...LEADER 9 OWNER S MANUAL S PORTS ET LOISIRS 092583 Index D...
Page 2: ......
Page 4: ......
Page 7: ...3 102 HISTORY OF UPDATES Index A 02 2010 Index B 09 2010 Index C 03 2011 Index D 03 2013...
Page 8: ......
Page 10: ......
Page 16: ......
Page 21: ...17 102 POSITION OF GAS BOTTLE 2 SAFETY...
Page 33: ...29 102 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 36: ......
Page 42: ...38 102 Access Engine compartment Control Footrests Pilot...
Page 48: ......
Page 49: ...45 102 STEERING SYSTEM STEERING GEAR 5...
Page 51: ...47 102 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 6...
Page 52: ...48 102 INTRODUCTION Deck Deck Sportop Cabins Engine...
Page 54: ...50 102 Galley Microwave Must be secured while sailing Mosquito net Blackout curtain...
Page 56: ......
Page 77: ...73 102 PROTECTION 12 V CIRCUIT General fuse 12V Location Technical room 8 ELECTRICAL EQUIPMENT...
Page 86: ...82 102 LEAD LINES Location...
Page 87: ...83 102 ENGINE GENERAL INFORMATION ENGINE INSTALLATION 9...
Page 97: ...93 102 LAUNCHING LAUNCHING RECOMMENDATIONS 10...
Page 98: ...94 102 POSITIONING OF HOISTING STRAPS Note Measurements are expressed in mm...
Page 101: ...97 102 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 104: ......
Page 106: ......