
The boat may be fi tted with an optional hydraulic gangway.
After you energized the domestic electrical system (24V electrical panel), the
gangway can work.
The gangway control is located on the desk of the port helm station.
A remote control is also available on board the boat (It can work only if the
domestic electrical system is energized).
If the gangway does not work, check its automatic breaker on the panel under
the step that gives access to the starboard aft cabin.
For the use and maintenance of the hydraulic gangway, please refer to its
instruction guide.
HULL / DECK
2.9
GANGWAY
27
2
Summary of Contents for 57
Page 1: ...INSTRUCTION GUIDE...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 9: ...SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS 7 1...
Page 10: ......
Page 14: ......
Page 16: ...14...
Page 30: ......
Page 46: ......
Page 54: ......
Page 66: ......
Page 78: ......
Page 79: ...ELECTRICITY 7 1 12V 24V CIRCUITS 7 2 INVERTERS 7 3 230V CIRCUIT 7 4 ELECTRONICS 77 7...
Page 92: ......
Page 102: ......
Page 103: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 101 9...
Page 104: ...102...
Page 106: ......
Page 107: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 105 10...
Page 108: ...106 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 200 mm 200 mm...
Page 110: ......
Page 112: ...110...
Page 120: ...118...
Page 122: ......
Page 123: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 121 12...
Page 126: ......
Page 128: ......
Page 129: ......
Page 130: ......