Section 7
UBA Pro RT/RQ™ Series Banknote Recycler
Operational Flowchart
© 2019, JAPAN CASH MACHINE CO., LTD.
3 4
RT/RQ Dispensing Flow Process (Abnormal)
RT/RQ Collecting in Cash Box Flow Process1
Figure 42
RT/RQ Abnormal Dispensing Flow
Figure 42
RT/RQ Abnormal Dispensing Flow Process
E) From “Dispensing (Normal)” flowchart (Figure 41)
b) Sending an Abnormal Operation Signal
d) Stop transporting the Banknote
a) Is the Banknote still in the abnormal condition (second time)?(*1)
C3) To “C3” Collecting in Cash Box 2 flowchart (Figure 44)
c) Was the Banknote transported out of the Recycler?
*1). The specific Banknote position, or an abnormal Banknote may be treated as an “Abnormal Error” occurrence condition.
C3
b
c
YES
NO
d
a
NO
YES
Figure 43
RT/RQ Collecting in Cash Box Flow
Figure 43
RT/RQ Collecting in Cash Box Flow Process 1
E) From “Collecting in Cash Box 2” flowchart (Figure 44)
d) Stop transporting the Banknote
a) Transporting the Banknote
C3) To “C3” Collecting in Cash Box flowchart 2 (Figure 44)
c) Was the Banknote transported out of the Recycler?
B3
C3
a
c
b
YES
NO
Summary of Contents for UBA Pro RQ Series
Page 6: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD iv THIS PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...
Page 57: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD...