Section 3
This section provides installation and operating
instructions for the UBA Pro RT/RQ™ Series
Banknote Recycler (RT/RQ). The information
within contains the following features:
•
Installation Procedure
•
Cable Interconnection
•
DIP Switch Configuration
•
LED Flashing Patterns
Installation Procedure
Holes are provided in each Frame Unit to accom-
modate mounting the RT/RQ Unit
during installa-
tion. Select and perform the following steps
required to install the RT/RQ Unit.
Grounding
1. Install the Toothed Washer (Figure 5
), the
Grounding Wire (Figure 5
b
) and then the Screw
) into the Frame Ground (Figure 5
)
in order.
2. Tighten the Screw to secure the Wire and Washer.
Side Installation (For Standard and
Stacking Up (SU) Installation types)
When a side mounting configuration is preferred,
per-
form the following procedure:
1. Secure the left and right side of the RT/RQ Frame
into its intended location using 8 (eight) M4
Screws from each side of the Frame (Figure 6
a
1
through
a
8
).
3
INSTALLATION
NOTE: Do Not exert external pressure
on the UBA Pro Unit. Strong pressure
on the Unit may cause the Unit‘s
performance to degrade.
NOTE: Ensure that there is sufficient
space to open, clean and maintain a UBA
Pro Unit. (Refer to “Unit Dimensions” on
Caution: Be sure to use specified Screw
Holes when installing the Unit.
Caution: To keep the Unit’ performance
optimal, ensure that the mounting
location is horizontally at 0 degrees on a
flat surface and strong enough to
ensure the Unit weight.
Caution: Be sure to connect the Frame
Housing to the Frame Ground of the
Host Machine.
NOTE: Prepare the following Grounding
Wire, Screw and Washer for grounding:
•
Grounding Cable with Conductor Diameter
1.6mm or lager
•
M4 W Washer (Large) Pan Head, Iron/
Chromium (III), 12mm or shorter
•
Toothed Washer
•
Tightening Torque: 120N·cm
NOTE: Refer to “Unit Dimensions” on
page 39) for each Frame Ground
location.
Figure 5
Figure 5
Grounding
Edge Side
Round Side
a
b
c
d
NOTE: Prepare the following Screw:
•
M4 Screw (the length of each M4 Screw
should not extend more than 6mm long
from the inside of the Frame)
•
Tightening Torque: 120N·cm
Figure 6
Side Installation (Standard and SU
Figure 6
Side Installation (Standard and SU
Installation Types)
a
1
a
2
a
3
a
4
a
5
a
6
a
7
a
8
a
1
a
2
a
3
a
4
a
5
a
6
a
7
a
8
SH2 Box Frame
Large Box Frame
Summary of Contents for UBA Pro RQ Series
Page 6: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD iv THIS PAGE INTENTIONALLY LEFT BLANK...
Page 10: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...
Page 57: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD...