background image

P/N 960-000209R_Rev. A 

© 2019, JAPAN CASH MACHINE CO., LTD. 

9

Installation

UBA Pro RT/RQ™ Series  Banknote Recycler 

Section 3

This section provides installation and operating 

instructions for the UBA Pro RT/RQ™ Series 

Banknote Recycler (RT/RQ). The information 

within contains the following features:

•  

Installation Procedure

•  

Cable Interconnection

•  

DIP Switch Configuration

•  

LED Flashing Patterns

Installation Procedure

Holes are provided in each Frame Unit to accom-

modate mounting the RT/RQ Unit

 

during installa-

tion. Select and perform the following steps 

required to install the RT/RQ Unit.

Grounding 

1.  Install the Toothed Washer (Figure 5

 a

), the 

Grounding Wire (Figure 5

 b

) and then the Screw 

(Figure 5

 c

) into the Frame Ground (Figure 5

 d

in order.

2.  Tighten the Screw to secure the Wire and Washer.

Side Installation (For Standard and 

Stacking Up (SU) Installation types)

When a side mounting configuration is preferred, 

per-

form the following procedure:

1.  Secure the left and right side of the RT/RQ Frame 

into its intended location using 8 (eight) M4 

Screws from each side of the Frame (Figure 6 

a

1

 

through 

a

8

).

3

INSTALLATION

NOTE: Do Not exert external pressure 

on the UBA Pro Unit. Strong pressure 

on the Unit may cause the Unit‘s 

performance to degrade.

NOTE: Ensure that there is sufficient 

space to open, clean and maintain a UBA 

Pro Unit. (Refer to “Unit Dimensions” on 

page 39).

Caution: Be sure to use specified Screw 

Holes when installing the Unit.

Caution: To keep the Unit’ performance 

optimal, ensure that the mounting 

location is horizontally at 0 degrees on a 

flat surface and strong enough to 

ensure the Unit weight.

Caution: Be sure to connect the Frame 
Housing to the Frame Ground of the 
Host Machine.

NOTE: Prepare the following Grounding 

Wire, Screw and Washer for grounding:

•  

Grounding Cable with Conductor Diameter 

1.6mm or lager 

•  

M4 W Washer (Large) Pan Head, Iron/

Chromium (III), 12mm or shorter

•  

Toothed Washer

•  

Tightening Torque: 120N·cm

NOTE: Refer to “Unit Dimensions” on 

page 39) for each Frame Ground 

location.

Figure 5 

Grounding 

Figure 5 

Grounding

Edge Side

Round Side 

a

b

c

d

NOTE: Prepare the following Screw:

•  

M4 Screw (the length of each M4 Screw 

should not extend more than 6mm long 

from the inside of the Frame)

•  

Tightening Torque: 120N·cm

Figure 6 

Side Installation (Standard and SU 

Figure 6 

Side Installation (Standard and SU 

Installation Types)

a

1

a

2

a

3

a

4

a

5

a

6

a

7

a

8

a

1

a

2

a

3

a

4

a

5

a

6

a

7

a

8

SH2 Box Frame

Large Box Frame

Summary of Contents for UBA Pro RQ Series

Page 1: ...019 JAPAN CASH MACHINE CO LTD D A 66 Image1 Website http www jcmglobal com Issue 4115 IGE 01 00 UBA Pro RT RQ Series Banknote Recycler Integration Guide Revision A October 23 2019 P N 960 000209R_Rev...

Page 2: ...l JCM retains all rights to amend alter change or delete any portion of this Manual in whole or in part or add items thereto without notice regarding the product or its related products JCM is a regis...

Page 3: ...llation For Standard and Stacking Up SU Installation types 9 Bottom Installation For Standard Installation Type Only 10 Bezel Installation 10 External Harness Installation 10 Cash Box Lock Installatio...

Page 4: ...FLOWCHART 29 RT RQ Main Flow Process 29 RT RQ Accepting Banknotes Flow Process 30 RT RQ Transporting to Recycler Flow Process 31 RT RQ Transporting to Cash Box Flow Process 32 RT RQ Dispensing Flow P...

Page 5: ...0 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD iii UBA Pro RT RQ Series Banknote Recycler JCM Europe GmbH 44 UK Ireland 44 JCM Europe UK Office 44 Asia and Oceania 44 JCM Gold HK Ltd 44 JAPAN CASH MAC...

Page 6: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD iv THIS PAGE INTENTIONALLY LEFT BLANK...

Page 7: ...Banknote Jam Clear 3 20 Figure 22 RT Transport Banknote Jam Clear 4 20 Figure 23 RT Transport Banknote Jam Clear 5 21 Figure 24 RQ Transport Banknote Jam Clear 1 21 Figure 25 RQ Transport Banknote Ja...

Page 8: ...utside Dimension and Installation Maintenance Space Requirement 39 Figure 46 RT Unit With Large Box Outside Dimension and Installation Maintenance Space Requirement 40 Figure 47 RQ Unit With SH2 Box O...

Page 9: ...n Acceptance Settings 11 Table 10 Sub Board 2 Interface Settings 12 Table 11 Recycler and Transport LEDs Flashing Patterns 13 Table 12 Status LED Flashing Patterns 13 Table 13 USB Interface Connector...

Page 10: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...

Page 11: ...this device easier and make navigation within this manual simpler the following illustrations were used within the text Safety Instructions need to be observed in order to protect the operators and th...

Page 12: ...ns No 1 Cash Box Capacity 4 400 notes SH2 Box New Banknote 8 800 notes Large Box New Banknote 2 Cash Box Type 0 Standard 3 Cash Box Handle 0 Standard 4 Sub Board Type 0 Reserved 1 Reserved 2 Sub Board...

Page 13: ...ugs to avoid the risk of damage to the Unit 2 Be sure to carry the Unit by both hands when transporting it Holding the Unit by one hand may cause personal injury if the Unit accidentally becomes disas...

Page 14: ...ecycler containing two drums for recycling two denominations of Banknotes The RQ Unit is equipped with two high capacity compact Recyclers each containing two drums for recycling four denominations of...

Page 15: ...cations Figure 4 RT RQ Component Locations Figure 4 RT RQ Component Locations Standard Stacking Up SU SH2 Box Large Box RQ Unit RT Unit Recycler Direction for RT Transport Recycler Direction H1 H1 I I...

Page 16: ...Front 2 Front Transport Unit 2 UBA Pro Status LED Orange K 1 Recycler Lock 3 USB Type C Connector Maintenance 2 Recycler LED 4 UBA Pro Status LED Green 3 Transport LED 5 UBA Pro Status LED Red 4 Stat...

Page 17: ...line Print Width Wider than 10mm 0 39 in Insertion Direction Banknote Refer to the specific Country s Software Information Sheet Barcode Coupon Four way with Upper and Lower Barcode Sensor option Proc...

Page 18: ...ds on the Banknote s condition and denomination 150mm New Banknote Only Table 6 RT RQ Environmental Specifications Operating Temperature 5 C to 50 C 41 F to 122 F Depends on hydrothermal conditions St...

Page 19: ...ION NOTE Do Not exert external pressure on the UBA Pro Unit Strong pressure on the Unit may cause the Unit s performance to degrade NOTE Ensure that there is sufficient space to open clean and maintai...

Page 20: ...ash Box Lock Installation One or two security locks can be installed onto a Cash Box When installing a security lock the fol lowing attachment accessories may be required Two Key Spacers Plate Lock Ke...

Page 21: ...hen using only one lock the remaining blank hole does not provide access to Cash Box contents However some regulatory authorities may require installation of a Key Cap Figure 13 Key Cap Installation F...

Page 22: ...C Photo Coupler Isolation or ccTalk Table 10 Table 10 Sub Board 2 Interface Settings Settings Description SW1 Photo Coupler Isolation RS232C cc Talk USB SW2 To use a UBA Pro Unit with a Recycler Unit...

Page 23: ...e UBA Pro Unit Refer to the UBA Pro Series Universal Banknote Acceptor Integration Guide for the UBA Pro Unit s details Error occurred while a Banknote was being dispensed Return the cash in the RT RQ...

Page 24: ...Pro Unit Side DRA 20PC FO JAE Contact UBA Pro Unit Side D02 22 26P 10000 JAE Socket Frame Side DRA 20SC FO JAE Contact Frame Side D02 22 26S 10000 JAE Contact Frame Side Pin No 3 No 13 D02 22 22S 100...

Page 25: ...RT RQ Unit s side Function 1 Reserved For the UBA Pro Side 2 Reserved For the UBA Pro Side 3 M RES IN Acceptor Hard Reset Signal Line 4 TXD OUT Output Signal Line from Acceptor to Host 5 Reserved For...

Page 26: ...it s side Function 1 Reserved For the UBA Pro Side 2 Reserved For the UBA Pro Side 3 M RES IN Acceptor Hard Reset Signal Line 4 TXD OUT Output Signal Line from Acceptor to Host 5 Reserved For the UBA...

Page 27: ...wed from the RT RQ Unit s side Function 1 Reserved For the UBA Pro Side 2 Reserved For the UBA Pro Side 3 M RES IN Acceptor Hard Reset Signal Line 4 NC No Connection 5 Reserved For the UBA Pro Side 6...

Page 28: ...al Name I O Function 1 Reserved The pin is used on the UBA Pro Side 2 Reserved The pin is used on the UBA Pro Side 3 Reserved The pin is used on the UBA Pro Side 4 Reserved The pin is used on the UBA...

Page 29: ...2 Remove the Cash Box Figure 17 a 3 Use the appropriate User supplied Key s to unlock the Cash Box Figure 17 b 4 Open the Cash Box Door and remove the col lected Banknotes Figure 17 c Dispense Setting...

Page 30: ...ere Fig ure 20 c 4 If the Banknote jam location is not visible press down on the Front Transport Unit s Release Lever Figure 21 a to pull up the Front Transport Unit Figure 21 b 5 Remove any jammed Ba...

Page 31: ...sport Unit Figure 26 b 5 Remove any jammed Banknote found there Fig ure 26 c 6 If the Banknote jam location is not visible press down on the Transport Unit s Lever Figure 27 a to pull down the Transpo...

Page 32: ...Open the UBA Pro Unit s Cover 3 Clean the Sensor Lens and Rollers in the Banknote Path 4 Pull the Recycler out of the RT RQ Frame 5 Clean the Sensor Lenses Roller and Belts located in the RT RQ Frame...

Page 33: ...nit s interior otherwise the Unit may not operate correctly NOTE When closing or installing the UBA Pro Unit or the Recycler ensure it firmly clicks into place Also when re assembling the RT RQ Unit e...

Page 34: ...sensor and roller cleaning locations Figure 34 RT RQ Sensor Roller and Belt Clean ing Locations Figure 34 RT RQ Sensor Roller and Belt Cleaning Locations 2 1 D F E RQ Unit H 6 5 4 Recycler A or D B or...

Page 35: ...ed Air 2 Drum 2 Tape Full Empty Sensor 2 RT RQ Transport H Exit Prism Wipe clean using a dry lint free cloth cotton swab I 1 Note Position Sensor 1 RT Transport Wipe clean using a dry lint free cloth...

Page 36: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 5 UBA Pro RT RQ Series Banknote Recycler Preventive Maintenance P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD 2 6...

Page 37: ...UBA Pro RT RQ Series Banknote Recycler RT RQ Bezel Connector Interface Circuit Schematics Figure 35 Bezel Connector Interface Circuit Schematics Figure 35 Bezel Connector Interface Circuit Schematics...

Page 38: ...Serial OUT DOUT RIN INV EN VCC V V GND DIN ROUT FOF F FON C1 C1 C2 C2 DC3 3V GND GND GND DC3 3V GNDGNDGND DC3 3V DC3 3V GND 10K DC3 3V 0 1uF 0 1uF 0 1uF 0 1uF 0 1uF 0 1uF TPD2E007 4 6 13 GND GND GND C...

Page 39: ...igure 37 RT RQ Main Flow Process a Initializing b Stand by c Inhibit acceptance e Status LED is ON f Taking the Banknote in g Dispensing the Banknote A Return To A in this flowchart h Collecting the B...

Page 40: ...C1 B1 YES YES YES NO NO NO g B1 From Main flowchart Figure 37 b Centering the Banknote c Transporting the Banknote e Stop Transportation f Is the Banknote authentic g Return the Banknote h Inhibit acc...

Page 41: ...FULL Signal 2 a Transporting the Banknote to the Recycler f Stop operation Abnormal Signal Output 1 b Was the Banknote transported to the Recycler e Was an Abnormal Error detected by the PB Unit h Col...

Page 42: ...ll j Stop operation Sending a FULL Signal 2 a Transporting the Banknote to the Cash Box f Stop operation Abnormal Signal Output 1 b Was the Banknote transported to the Cash Box e Was an Abnormal Error...

Page 43: ...on Dispensing signal output 1 h Was the Banknote removed a Transporting the Banknote c Is the Banknote in an abnormal condition g Sending an Abnormal Operation Signal F Return To F in this flowchart i...

Page 44: ...te still in the abnormal condition second time 1 C3 To C3 Collecting in Cash Box 2 flowchart Figure 44 c Was the Banknote transported out of the Recycler 1 The specific Banknote position or an abnorma...

Page 45: ...spensing Figure 41 a Transporting the Banknote to the Cash Box d Stop operation Abnormal Signal Output 1 i Was the desired number of Banknotes collected during Collecting in Cash Box sequence A Return...

Page 46: ...r determining the cause of a failure repair the Unit by replacing any appropriate parts deemed necessary Perform the Performance Tests and then perform a Sensor readjustment to complete the repair LED...

Page 47: ...Drum 2 is full RT Transport Banknote Jam in a transport path RQ Transport Banknote Jam in a transport path RT Transport Recycler Drum 1 and or Drum 2 is empty RQ Transport Recycler Drum 1 and or Drum...

Page 48: ...h RT Transport Flapper timeout RQ Transport Flapper timeout RT Transport Flapper Lever error RQ Transport Flapper Lever error RT Transport Flapper Motor lock up RQ Transport Flapper Motor lock up Tabl...

Page 49: ...rates the RT Unit with a SH2 Box 400 Notes Outside Dimension and the spaces required to clean and maintain the RT Unit Figure 45 RT Unit With SH2 Box Outside Dimension and Installation Maintenance Spa...

Page 50: ...d the spaces required to clean and maintain the RT Unit Figure 46 RT Unit With Large Box Outside Dimension and Installation Maintenance Space Figure 46 RT Unit With Large Box Outside Dimension and Ins...

Page 51: ...aces required to clean and maintain the RQ Unit Figure 47 RQ Unit With SH2 Box Outside Dimension and Installation Maintenance Space Figure 47 RQ Unit With SH2 Box Outside Dimension and Installation Ma...

Page 52: ...spaces required to clean and maintain the RQ Unit Figure 48 RQ Unit With Large Box Outside Dimension and Installation Maintenance Space Figure 48 RQ Unit With Large Box Outside Dimension and Installa...

Page 53: ...TD 4 3 Bezel Outside Dimensions Figure 49 illustrates the Bezel Outside Dimensions Figure 49 Bezel Outside Dimensions Figure 49 Bezel Outside Dimensions 25 1 2 5 11 7 1 55 35 2 5 20 8 1 4 25 1 2 5 11...

Page 54: ...1 Fax 44 0 190 837 7834 Unit B Third Avenue Denbigh West Business Park Bletchley Milton Keynes Buckinghamshire MK1 1DH UK E mail support jcmglobal eu Asia and Oceania JCM Gold HK Ltd Phone 852 2429 71...

Page 55: ...P Precautionary Symbols types of 2 Preventive Maintenance cleaning material requirements 19 Primary Features UBA Pro RT RQ Product Series of 4 R RC Recycler acronym for a 1 7 9 14 19 27 29 36 39 RT R...

Page 56: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD 4 6 Section 11 UBA Pro RT RQ Series Banknote Recycler Index THIS PAGE INTENTIONALLY LEFT BLANK...

Page 57: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD...

Page 58: ...P N 960 000209R_Rev A 2019 JAPAN CASH MACHINE CO LTD Issue 4115 IGE 01 00 UBA Pro RT RQ Series Banknote Recycler...

Reviews: