P/N 960-100175R_Rev. 6 {EDP #200824}
© 2016, JAPAN CASH MACHINE CO., LTD.
2 - 1 6
Section 2
Taiko™ Series Banknote Acceptor
Installation
Operational Flowcharts (Continued)
Figure 2-28 depicts part two of a typical Taiko™ Banknote acceptance flow process.
Figure 2-29 depicts part three of a typical Taiko™ Banknote acceptance flow process.
Figure 2-28
Taiko Operational Flowchart (Part
a) Transport the Banknote out
(Carry the Banknote to the Cash Box)
b) Has the Banknote transported?
c) Retried carrying the Banknote out
d) Has the Banknote transported?
B) To “Part 1” (Figure 2-27)
g) Stop Operation
A) From “Part 1” (Figure 2-27)
e) Output the VEND Signal
f) Proceed Completed
h) The Red LED flashes
d
a
A
e
f
B
b
c
g
h
Yes
No
Yes
No
Figure 2-28
Taiko Operational Flowchart (Part 2)
Taiko Operational Flowchart (Part
Figure 2-29
Taiko Operational Flowchart (Part 3)
a) Reject the Banknote
b) Has the Banknote rejected?
c) Retried rejecting the Banknote
d) Has the Banknote rejected
B) To “Part 1” (Figure 2-27)
g) Stop Operation
A) From “Part 2” (Figure 2-27)
h) The Red LED flashes
B
C
g
h
d
a
b
c
Yes
No
No
Yes