
P/N 960-100929R_Rev. 7 {EDP #148849}
© 2017, JAPAN CASH MACHINE CO., LTD.
4 - 1 4
Section 4
iVIZION® Series Next-Generation Banknote Acceptor Unit
Disassembly/Reassembly
Validation Unit Timing Belt
Removal
To remove Timing Belt proceed as follows:
1. Remove the three (3) Side Plate Cover Mounting
Screws (Figure 4-46
a
1
,
a
2
& a
3
) located on right
side of the Lower Validation Section.
2. Remove the Cover (Figure 4-46
b
) from the
Lower Validation Section.
3. Remove Timing Belt (Figure 4-46
c
) from the
Lower Validation Section.
Reassembly Cautions
When reassembling the Upper/Lower UV Sensors,
make sure that both of the Sensor positions and
directions are correctly placed. Match the Connec-
tor’s position as illustrated in Figure 4-48
.
Disassembly and Reassembly of the iVIZION Unit
is now complete.
NOTE: Follow the same procedure
to remove the opposite side Timing
Belt.
Figure 4-46
Figure 4-46
Timing Belt Removal
a
1
a
2
a
3
b
c
NOTE: The Timing Belt should be
reinstalled as illustrated by the
Blue
path
shown in Figure 4-47 when the Unit is
being reassembled.
Figure 4-47
Figure 4-47
Timing Belt Replacement
Figure 4-48
Upper/Lower UV Sensors Location
a
a
[Upper]
NOTE: Ensure that all Sensors and
the iVIZION BG 85B Head surfaces
are absolutely clean before
reassembling the iVIZION Unit. Also
ensure that all Finger Prints,
smudges, dirt or film that exists on
any surfaces in the Transport path
are removed.