VEGA™ Series Banknote Validator
Section 6
3. Turn the VEGA Unit Power
ON
, and the Perfor-
mance Test Mode will activate.
Performance Test Initiation
Set the various DIP Switches listed in Table 6-2 for
each test AFTER the Performance Test Mode is
activated. Once the DIP Switches on both DS1 and
DS2 have been set for the desired Test; set DIP
Switch DS1, Switch #1 to
OFF
to begin the test. To
stop the current Test and return to the Standby
Mode, reset DIP Switch DS1 #1 to
ON
.
The following information describes each test in
detail.
DIP S
WITCH
T
EST
Perform the following steps to test the functionality
of each DIP Switch Block:
1. Ensure that the VEGA Unit power is
OFF
.
2. Set all Switches on DIP Switch DS1 and DS2 to
ON
as indicated in Table 6-2 for this Test.
3. Turn the VEGA Unit power
ON
.
4. Set DIP Switch DS1 #1 to ON to begin the test.
Confirm that the Front Panel LED will extin-
guish.
5. Set the ODD numbered DIP Switches (i.e., DIP
Switch DS1 and DS2 Switches #1, #3, #5 and #7)
to
OFF
. The Front Panel LED flashes at a
Yellow
Color rate.
6. Set the EVEN numbered DIP Switches (i.e., DIP
Switch DS1 and DS2 Switches #2, #4, #6 and #8)
to
OFF
. The Front Panel LED flashes at a
Blue
Color rate if all of the DIP Switches function cor-
rectly.
F
EED
M
OTOR
F
ORWARD
R
OTATION
T
EST
Perform the following steps to test the normal for-
ward rotation functionality of the Feed Motor:
1. Ensure that the VEGA Unit power is
OFF
.
NOTE: When the VEGA
Performance Test Mode begins, the
Front Panel LED slowly flashes at a
Green
Color rate.
Table 6-2
Performance Test DIP Switch Configuration Settings
Test Type
DIP Switch Block 1 Switch#
DIP Switch Block 2 Switch#
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
DIP Switch Test
ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON
Feed Motor Normal Rotation Test
ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
Feed Motor Reverse Rotation Test
ON ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
Stacker Motor Test
ON OFF ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
Aging Test
ON ON ON ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
Off-line Banknote Acceptance Test
ON OFF ON OFF ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
Sensor Test
ON ON ON ON ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
Standby Color Indication
(Rainbow Gradient)
*
ON ON OFF OFF OFF OFF ON OFF OFF OFF OFF OFF OFF OFF OFF OFF
Standby Color Indication (Green)
†
ON OFF ON OFF OFF OFF ON OFF OFF OFF OFF OFF OFF OFF OFF OFF
Standby Color Indication (Blue)
‡
ON OFF OFF ON OFF OFF ON OFF OFF OFF OFF OFF OFF OFF OFF OFF
ccTalk Encryption Code Initialization
**
ON ON ON ON ON ON OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
*. See “LED Pattern Setting Mode” on page 2-3 for making “Rainbow” setting (Gradation).
†. See “LED Pattern Setting Mode” on page 2-3 for making GREEN setting (Green).
‡. See “LED Pattern Setting Mode” on page 2-3 for making BLUE setting (Blue).
**. See “Rewriting ccTalk Encryption Code (Initialize)” on page 2-3 for making the communication Protocol setting.
DIP Switch Configuration Settings
Table 6-2 lists the various Performance Test DIP Switch Setting configurations for each test type.
NOTE: After performing an “Off-line”
Banknote Acceptance Test, cycle the
VEGA Unit’s power OFF/ON to return to
the Standby Mode. Unless the power is
turned OFF/ON, the next test WILL NOT
run.
NOTE: If the DIP Switches were set
incorrectly during the test, the Front
Panel LED flashes
Red
, indicating a
Test failure. However, if the DIP
Switches were set correctly, and the
LED still flashes
Red
, then a DIP
Switch failure is indicated.