background image

P/N 960-000211R_Rev. A 

© 2020, JAPAN CASH MACHINE CO., LTD. 

6 - 1 4

Section 6

UBA™ Pro Series Universal Banknote Acceptor 

Calibration and Testing

Entrance Motor Speed Test (Forward)

To perform the Entrance Motor Speed Test in the for-

ward rotation, proceed as follows:

1.  Launch the Performance Test Program (see 

page 6-8).

2.  Select “

ENTRY_MOTOR_FWD_TEST

” (Figure 

6-66 

a

).

3.  Click the “

Start

” 

Screen Button (Figure 6-

66 

b

).

4.  The measured time will appear in the 

“Entrance 

Motor

” area (Figure 6-67 

a

) on the Screen.

5.  Confirm that the motor speed is in the acceptable 

range: 550mm/sec to 1200mm/sec.

6.  Click the “

Stop

” 

Screen Button (Figure 6-

67 

b

) to end the test.

Entrance Motor Speed Test (Reverse)

To perform the Entrance Motor Speed Test in the 

reverse rotation, proceed as follows:

1.  Launch the Performance Test Program (see 

page 6-8).

2.  Select “

ENTRY_MOTOR_REV_TEST

” (Figure 

6-68 

a

).

3.  Click the “

Start

” 

Screen Button (Figure 6-

68 

b

).

4.  The measured time will appear in the “

“Entrance 

Motor

” area (Figure 6-69 

a

) on the Screen.

5.  Confirm that the motor speed is in the acceptable 

range: 550mm/sec to 1200mm/sec. 

6.  Click the “

Stop

” 

Screen Button (Figure 6-

69 

b

) to end the test.

Figure 6-66 

Entrance Motor Speed Test 

Figure 6-66 

Entrance Motor Speed Test 

(Forward) 1

a

b

Figure 6-67 

Entrance Motor Speed Test 

Figure 6-67 

Entrance Motor Speed Test 

(Forward) 2

a

b

Figure 6-68 

Entrance Motor Speed Test 

Figure 6-68 

Entrance Motor Speed Test 

(Reverse) 1

a

b

Figure 6-69 

Entrance Motor Speed Test 

Figure 6-69 

Entrance Motor Speed Test 

(Reverse) 2

b

a

Summary of Contents for UBA Pro Series

Page 1: ...2020 JAPAN CASH MACHINE CO LTD Website http www jcmglobal com UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual Revision A P N 960 000211R_Rev A Issue 4116 SME 01 00...

Page 2: ...is publication Copyright 2020 By JAPAN CASH MACHINE CO LTD UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual Electrical Current Symbol Direct Current indicates Direct Current...

Page 3: ...Specifications 1 7 Structural Specifications 1 7 Unit Dimensions 1 8 UBA Pro with Standard 500 Note Cash Box Outside Dimension 1 8 UBA Pro with Standard or ICB 900 Note Cash Box Outside Dimension 1 9...

Page 4: ...ub Board 2 Photo Coupler Isolation Connector Pin Assignment 2 12 Sub Board 2 RS232C Connector Pin Assignment 2 13 Sub Board 2 cc Talk Connector Pin Assignment 2 14 Sub Board 2 TTL Connector Pin Assign...

Page 5: ...9 5 WIRING DIAGRAMS 5 1 UBA Pro Wiring Diagram 5 1 6 CALIBRATION AND TESTING 6 1 Tool Requirements 6 1 Installation Procedures 6 1 Part 1 JCM Tool Suite Installation 6 1 Part 2 USB Drivers Installatio...

Page 6: ...eration Test 6 22 PB Motor Operation Test 6 23 Centering Motor Operation Test 6 23 Stacker Motor Operation Test 6 24 Entrance Motor Operation Test Forward 6 24 Entrance Motor Operation Test Reverse 6...

Page 7: ...d ICB Error and Reject Code Conditions A 4 Standard Error Code Conditions A 4 ICB Error Code Conditions A 6 LED Flash Reject Error Code Conditions Banknotes A 6 LED Flash Reject Error Code Conditions...

Page 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...

Page 9: ...Pro Sensor and Roller Locations 2 18 Figure 2 17 UBA Pro Sub Board 1 Interface Circuit Schematic Diagram 1 2 19 Figure 2 18 UBA Pro Sub Board 1 Interface Circuit Schematic Diagram 2 2 20 Figure 2 19...

Page 10: ...Removal 1 4 8 Figure 4 39 PDIC Array Removal 2 4 8 Figure 4 40 PDIC Array Removal 3 4 9 Figure 4 41 PDIC Array Removal 4 4 9 Figure 4 42 Lower BAR Sensor Removal 4 9 Figure 4 43 Slide Roller Removal 1...

Page 11: ...6 10 Figure 6 50 Sensor Test 1 6 11 Figure 6 51 Sensor Test 2 6 11 Figure 6 52 Aging Test 6 11 Figure 6 53 DIP Switch Test 1 6 11 Figure 6 54 DIP Switch Test 2 6 11 Figure 6 55 DIP Switch Test 3 6 12...

Page 12: ...Test Reverse 4 6 20 Figure 6 97 Sensor Test 1 6 20 Figure 6 98 Sensor Test 2 6 20 Figure 6 99 Sensor Test 3 6 20 Figure 6 100 Aging Test with Cash Box 1 6 21 Figure 6 101 Aging Test with Cash Box 2 6...

Page 13: ...gure 6 138 Entrance and Feed Motors Simultaneous Speed Test Reverse 2 6 26 Figure 6 139 Entrance and Feed Motors Simultaneous Speed Test Reverse 3 6 26 Figure 6 140 Entrance and Feed Motors Simultaneo...

Page 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...

Page 15: ...ub Board 2 TTL Connector Pin Assignments 2 15 Table 2 14 CN5 Bezel Connector Pin Assignments 2 15 Table 2 15 UBA Pro Sensors and Cleaning Methods 2 18 Table 6 1 List of the UBA Pro Performance Tests 6...

Page 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...

Page 17: ...ns Unit Dimensions Technical Contact Information In order to make operating this device and navigating within this manual easier the following illustrations are used Safety Instructions need to be obs...

Page 18: ...0 Black Standard 6 Bezel Option 0 No Bezel 1 Black 2 Green LEDs Bezel 85 Standard Installation 2 Reserved 8 Reserved 9 Reserved A Reserved B Black 2 Blue LEDs SU Installation 7 ICB Option 0 Not Suppo...

Page 19: ...sive outside pressure on the Unit or subject it to excessive vibration during transportation 5 Check that the Transport Section and or the Cash Box does not drop off the Unit when pulling it forward a...

Page 20: ...Acceptor Unit con tains the following primary features The UBA Pro Unit is backwards compatible with all previous UBA and iPRO Series Unit just by replacing its Acceptor Head Unit Upgrade of current U...

Page 21: ...es a Acceptor Head Unit b Frame Unit c Bezel d Cash Box e Upper Guide Access Lever f Acceptor Head Unit Release Lever g Cash Box Handle h Centering Guide Shaft i DIP Switches Front j Status LED Orange...

Page 22: ...Interleaved 2 of 5 Narrow Bar 0 5mm 0 6mm 0 019 0 023 in Wide Bar to Narrow Bar ratio 3 1 Characters 18 Characters Print Position Middle Divides a Ticket equally from the left right top and bottom of...

Page 23: ...Only No Cabinet Vibration Do Not exposed to the elements including the internal Unit assemblies Table 1 6 UBA Pro Electrical Specification Measured on a new and factory default UBA Pro Unit Supply Vo...

Page 24: ...ates the UBA Pro Unit with a Standard 500 Note Cash Box Outside Dimension Figure 1 5 UBA Pro Unit With 500 Note Cash Box Outside Dimension FG 8 90 97 104 4 3 2 5 86 49 8 27 6 6 6 6 6 6 6 6 6 6 6 6 2 2...

Page 25: ...6 UBA Pro Unit With Standard or ICB 900 Note Cash Box Outside Dimension NOTE All dimensions in millimeter NOTE For the ICB 900 Note Box the ICB is equipped inside of the Box There is no difference in...

Page 26: ...igure 1 7 UBA Pro Unit With ICB 500 Note Cash Box Outside Dimension NOTE All dimensions in millimeters 8 90 97 104 4 3 2 5 86 49 8 27 6 6 6 6 6 6 6 6 6 6 6 6 2 21 3 5 3 5 50 2xM3 114 278 2 21 5 267 30...

Page 27: ...ax 44 0 190 837 7834 Unit B Third Avenue Denbigh West Business Park Bletchley Milton Keynes Buckinghamshire MK1 1DH UK E mail support jcmglobal eu Asia and Oceania JCM Gold HK Ltd Phone 852 2429 7187...

Page 28: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 1 UBA Pro Series Universal Banknote Acceptor General Information P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 1 1 2...

Page 29: ...the Frame in its intended mounting loca tion 3 Secure both right and left sides of the Frame into its intended location using six 6 specified Screws Figure 2 2 d1 through d6 from the out side of the...

Page 30: ...s intended location Refer to Side Installation on page 2 1 or Rear Installation on page 2 2 4 Install the UBA Pro Unit and the Cash Box back into the Frame Bezel Installation 1 Open the UBA Pro s Cove...

Page 31: ...xternal Harness Installation b1 b2 a Figure 2 7 Key Hole Location Figure 2 7 Key Hole Location Key Holes Figure 2 8 Key Hole Dimension Cylinder Length Figure 2 8 Key Hole Dimension Cylinder Length 19...

Page 32: ...BIT OFF VEND 3 ACCEPT 4 ON VEND 4 INHIBIT OFF VEND 4 ACCEPT 5 ON VEND 5 INHIBIT OFF VEND 5 ACCEPT 6 ON VEND 6 INHIBIT OFF VEND 6 ACCEPT 7 ON VEND 7 INHIBIT OFF VEND 7 ACCEPT 8 OFF Not Applicable N A N...

Page 33: ...LED Flash Reject Error Code Conditions Barcode Tickets on page A 8 Flashes OFF Error Standard Standard error occurred Refer to Standard Error Code Conditions on page A 4 Flashes ON Error Boot Program...

Page 34: ...rical resistance of a wire Approximately 150m For 12V DC the thinner or longer wiring harness than recommended specifications may cause the UBA Pro Unit to reset caused by voltage drop Connector Housi...

Page 35: ...GND Power DC Power Supply 3 M RES IN Acceptor Reset Signal Line 4 No Connection 5 12V I F Interface Power Supply 12V DC 6 No Connection 7 No Connection 8 VBUS1 USB1 Communication Vbus Signal Line 5V...

Page 36: ...Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor Res...

Page 37: ...0 JAE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Accepto...

Page 38: ...O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor Reset Signal Line 4 No Co...

Page 39: ...utput is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor Reset Signal Line 4 No Connection 5 12...

Page 40: ...AE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Acceptor R...

Page 41: ...000 JAE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M RES IN Accep...

Page 42: ...2 22 26S 10000 JAE Pin No Signal Name I O I O input output is the terminal as viewed from the Banknote Acceptor s backside Function 1 Power 12V to 24V DC Power Supply 2 GND Power DC Power Supply 3 M R...

Page 43: ...tion 7 No Connection 8 No Connection 9 No Connection 10 No Connection 11 O TTL1 OUT TTL Open Collector Output Signal Line 1 12 No Connection 13 GND SG 0V DC Power Supply 14 LED POWER LED Drive Line An...

Page 44: ...ed Banknote Figure 2 13 b1 3 Remove the UBA Pro Unit Figure 2 13 c from the Frame Figure 2 13 d 4 Remove any jammed Banknote found in the Transport or Cash Box area Figure 2 13 b2 5 If the Banknote ja...

Page 45: ...or Whenever Sensors Rollers or Banknote Path are dirty due to dust foreign objects or similar debris adhering to them Caution Do not use alcohol thinner or citrus based products for cleaning any Bankn...

Page 46: ...loth cotton swab or Blow clean using non flammable Compressed Air Refer to Cleaning Procedure on page 2 17 b Centering Start Sensor c1 Validation Sensor PDIC Sensor Array c2 Validation Sensor LED Ligh...

Page 47: ...VIN 12V I F M RESET GND GND TLP291 2R2K 1SS352 DC3 3V GND NYI 1 2 5 3 GND DC12V DC24V Interface Connector Opto GND GND Opto GND GND PC400 DC5V 100 F 4R7K NYI DC3 3V NYI PC400 DC3 3V 2R2K 1SS352 7 GND...

Page 48: ...ull speed USB Vbus user1 USB DM user1 USB DP user1 GND 33 33 1uF TPD2E2U06 GND USB GND GND USB GND 100 8 9 10 12 GND Interface Connector USB DM user2 USB DM user2 16 DC3 3V DC5V USB2 VBUS USB DP user2...

Page 49: ...400 DC3 3V 2R2K 1SS352 7 GND GND GND Serial IN Serial OUT Serial IN Serial OUT DOUT RIN INV EN VCC V V GND DIN ROUT FOFF FON C1 C1 C2 C2 DC3 3V GND GND GND DC3 3V GND GND GND DC3 3V DC3 3V 10K DC3 3V...

Page 50: ...l speed USB Vbus user1 USB DM user1 USB DP user1 GND 33 33 1uF TPD2E2U06 GND USB GND GND USB GND 100 8 9 10 12 GND Interface Connector GND GND GND GND 13 cc Talk I TTL2 cc Talk I TTL2 16 GND 10K UMH3N...

Page 51: ...DC12V D12V I TTL3 N C N C PW GND 5 6 GND DC5V GND UMH3N 0 GND DC3 3V GND UMH3N DC3 3V 0 1 2 3 4 7 8 5 6 Bezel Connector Interface Connector 8 5 Sub Board 2 19 18 17 Max100mA Max100mA N C N C 12V 12V N...

Page 52: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 2 2 4 UBA Pro Series Universal Banknote Acceptor THIS PAGE INTENTIONALLY LEFT BLANK...

Page 53: ...wchart Figure 2 22 UBA Pro Initialization and Banknote Acceptance Flowchart b Initializing c Stand by d Is the Banknote unacceptable INHIBIT f External LED is ON g Banknote inserted h Take in the Bank...

Page 54: ...ied the validation 2 times 1 g Return the Banknote i Rotate PB Unit E To E in this Flowchart l VEND Signal Output b g d e f i B E YES YES No NO a h j E m YES YES NO NO NO YES c D YES l k YES NO d Deno...

Page 55: ...o Collecting Flowchart a Collect the Banknote into the Cash Box b Is the Cash Box full c Stop operation Detected Cash Box Full 1 B From Validation Flowchart Figure 2 23 C To Initialization Flowchart F...

Page 56: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 2 UBA Pro Series Universal Banknote Acceptor Installation P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 2 2 8...

Page 57: ...37 7834 Unit B Third Avenue Denbigh West Business Park Bletchley Milton Keynes Buckinghamshire MK1 1DH UK E mail support jcmglobal eu Asia and Oceania JCM GOLD HK LTD Phone 852 2429 7187 Fax 852 2929...

Page 58: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 3 UBA Pro Series Universal Banknote Acceptor Communications P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 3 2...

Page 59: ...river Flat Blade Screwdriver E Ring Tool Tweezer UBA Pro and Cash Box Removal To remove the UBA Pro and the Cash Box out of the Frame proceed as follows 1 Pull the Lever Figure 4 1 a to release the lo...

Page 60: ...o 2 Screws Figure 4 7 c1 c2 and remove the Box Sensor Figure 4 7 d Sub Board Removal To remove the Sub Board proceed as follows 1 Release the six 6 Locking Tabs Figure 4 8 a1 through a6 and remove the...

Page 61: ...as follows 1 Unplug the two 2 Connectors Figure 4 13 a1 a2 and remove the FPC Harness Figure 4 13 b as illustrated by the Arrows 2 Unplug the six 6 Connectors Figure 4 14 a1 through a6 Figure 4 9 Sub...

Page 62: ...he Unit as illustrated 4 Remove the eight 8 Screws Figure 4 18 a1 through a8 5 Remove the CPU Board Cover Figure 4 18 b and the Waterproof Cover Figure 4 18 c Figure 4 15 Main Board Removal 3 b a6 a2...

Page 63: ...racket Assy Figure 4 21 a 2 Remove the single 1 Screw Figure 4 22 a 3 Remove and take the Centering HP Board Fig ure 4 23 a out through the side of the Unit as illustrated by the Arrow Figure 4 19 Cen...

Page 64: ...proceed as follows 1 Remove the two 2 Screws Figure 4 27 a1 a2 and remove the PB Motor Plate Assy Figure 4 27 b 2 Remove the two 2 Screws Figure 4 28 a1 a2 3 Slide and remove the PB Motor Harness Assy...

Page 65: ...4 34 a1 a2 to open the Centering Mechanism in the directions indicated by Arrows before opening the Cover 3 Remove the six 6 Screws Figure 4 35 a1 through a6 and remove the Transport Gear Cover Figur...

Page 66: ...5 Transport Motor Harness Assy Removal 3 b a1 a2 a3 a4 a6 a5 Figure 4 35 Transport Motor Harness Assy Removal 3 Figure 4 36 Transport Motor Harness Assy Removal 4 a1 a2 a6 a3 a5 a4 a7 a8 Figure 4 36 T...

Page 67: ...Disassemble the Slide Roller Assy to remove the Slide Rollers Figure 4 44 a1 a2 Figure 4 40 PDIC Array Removal 3 b a1 a2 Figure 4 40 PDIC Array Removal 3 Figure 4 41 PDIC Array Removal 4 b a c Figure...

Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 4 UBA Pro Series Universal Banknote Acceptor Disassembly Reassembly P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 4 1 0...

Page 69: ...ntrance Motor Encoder Sensor Transport Motor Encoder Sensor Stack Motor Encoder Sensor PB HP Sensor PB ENC Sensor Box Sensor ST HP Sensor Outside Temperature Sensor PCB Temperature Sensor Motor Temper...

Page 70: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 5 2 UBA Pro Series Universal Banknote Acceptor THIS PAGE INTENTIONALLY LEFT BLANK...

Page 71: ...tion zip Application Software and extract on to the Desk top 2 Double click on Setup exe Figure 6 2 a 3 The JCM Tool Suite Standard Edition Install Shield Wizard Screen shown in Figure 6 3 will appear...

Page 72: ...6 1 for the Tool Requirements and Har ness Connector locations 3 When the Device Driver Installation Wizard Screen Figure 6 7 appears click the Next Screen Button Figure 6 7 a to install the driver 4...

Page 73: ...with a PC JCM Tool Suite Standard Edition The Software Program is loaded on the Unit Upgrade The Software Program is not loaded on the Unit Initial e g after replacing the CPU Board To download the So...

Page 74: ...oftware download into the UBA Pro Unit 14 The Download Screen will display a Progress Bar during the download operation Figure 6 18 b and a Blue Text Line below the Download Screen Button will display...

Page 75: ...sides are tightly closed and locked Sensor Calibration To calibrate the UBA Pro sensors proceed as follows 1 Remove electrical power from the UBA Pro Unit 2 Set DIP Switches as below Figure 6 23 3 Co...

Page 76: ...until it clicks into place 17 Click the OK button Figure 6 29 a to begin the Sensor Calibration With Paper 18 4th Calibrate gain with paper through 5th Cali brate bar DA with paper calibration will au...

Page 77: ...Cover until it clicks into place 29 Click the OK button Figure 6 35 a to begin the Sensor Calibration With Paper 30 10th Double check AD with paper through 11th Write EEPROM items will automatically r...

Page 78: ...k the Stop Screen Button Figure 6 41 c to end the test Table 6 1 List of the UBA Pro Performance Tests Test Item Page Banknote Acceptance Test with Cash Box This test is available when the Cash Box is...

Page 79: ...form the Acceptance Test not validating Banknotes without the Cash Box proceed as follows 1 Remove the Cash Box 2 Launch the Performance Test Program see page 6 8 3 Select NO_JUDGE_ACCEPT_TEST Figure...

Page 80: ...Speed Test Reverse To perform the Feed Motor Speed Test in the reverse rotation proceed as follows 1 Ensure that the Cash Box is properly installed 2 Launch the Performance Test Program see page 6 8 3...

Page 81: ...witch Test proceed as follows 1 Launch the Performance Test Program see page 6 8 2 Select DIPSWITCH_TEST Figure 6 53 a 3 Click the Start Screen Button Figure 6 53 b 4 Switch the DIP Switch 1 through 8...

Page 82: ...1000msec 6 Click the Stop Screen Button Figure 6 57 b to end the test PB Motor Operation Time Test To perform the PB Motor Operation Time Test proceed as follows 1 Launch the Performance Test Program...

Page 83: ...Performance Test Program see page 6 8 2 Select STACKER_MOTOR_FWD_TEST Fig ure 6 62 a 3 Click the Start Screen Button Figure 6 62 b 4 Remove the Cash Box 5 Click the OK button Figure 6 63 a to start 6...

Page 84: ...tor Speed Test Reverse To perform the Entrance Motor Speed Test in the reverse rotation proceed as follows 1 Launch the Performance Test Program see page 6 8 2 Select ENTRY_MOTOR_REV_TEST Figure 6 68...

Page 85: ...o perform the Speed Test of the Entrance Motor and the Feed Motor in the reverse rotation at the same time proceed as follows 1 Launch the Performance Test Program see page 6 8 2 Select ENTRY_FEED_MOT...

Page 86: ...knote Acceptance with Cash Box Page 6 18 ON ON ON ON ON ON OFF Non Validation Banknote Acceptance without Cash Box Page 6 18 ON ON ON ON ON OFF Non Validation Banknote Reject Test with Cash Box Page 6...

Page 87: ...IP Switches as below Figure 6 77 3 Remove the Cash Box 4 Apply electrical power 5 Confirm that the Green and Red Status LEDs are lit 6 To start the Test set the DIP Switch 8 to OFF Figure 6 79 7 Inser...

Page 88: ...6 83 3 Remove the Cash Box 4 Apply electrical power 5 Confirm that the Green and Red Status LEDs are lit 6 To start the Test set the DIP Switch 8 to OFF Figure 6 85 7 Insert a Banknote 8 Confirm that...

Page 89: ...tatus LEDs are lit 5 Lift up on the Upper Guide Access Lever to open the UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 91 7 The Rollers will start running in the forward dir...

Page 90: ...to OFF Figure 6 99 6 Follow the each procedure below and confirm that the LED is lit as specified Figure 6 93 Feed Motor Operation Test Reverse 1 Figure 6 93 Feed Motor Operation Test Reverse 1 DIP Sw...

Page 91: ...r detects the Banknote PB IN Sensor Green LED PB OUT Sensor Red LED PB Home Centering Home 1 DIP Switch 3 ON 2 Open the Cover 3 Move the PB Guide with your finger 4 Confirm that the Green LED is lit 5...

Page 92: ...d Red Status LEDs are lit 5 To start the Test set the DIP Switch 8 to OFF Figure 6 112 6 The stacking operation will begin 7 Set the UBA Pro DIP Switch 8 to ON to end the test Figure 6 104 DI Figure 6...

Page 93: ...Green and Red Status LEDs are lit 5 Lift up on the Upper Guide Access Lever to open the UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 119 7 The Centering Mechanism will sta...

Page 94: ...he UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 127 7 The Rollers will start running in the forward direction when the Feed Motor functions prop erly 8 Set the UBA Pro DIP...

Page 95: ...ccess Lever to open the UBA Pro s Cover 6 To start the Test set the DIP Switch 8 to OFF Figure 6 135 7 The Rollers will start running in the forward direction when the Entrance and Feed Motors functio...

Page 96: ...est set the DIP Switch 8 to OFF Figure 6 139 7 The Rollers will start running in the reverse direction when the Entrance and Feed Motors function properly 8 Set the UBA Pro DIP Switch 8 to ON to end t...

Page 97: ...d View UBA Pro Upper Transport Guide Exploded View UBA Pro Transport Unit Exploded View UBA Pro Middle Bracket Exploded View UBA Pro Bottom Cover Exploded View 7 EXPLODED VIEWS AND PARTS LISTS NOTE Co...

Page 98: ...e LED 1 202274 UBA iPRO Bezel SS 8 R 82mm Black Green LED 1 202275 UBA iPRO Bezel SS A R 85mm Blue 2 Line Blue LED 1 For Standard SS installation With Relay Harness 202276 UBA iPRO Bezel SS B R 85mm G...

Page 99: ...Guide Exploded View Figure 7 2 UBA Pro Upper Transport Guide Exploded View Figure 7 2 UBA Pro Upper Transport Guide Exploded View 101 102 103 103 104 104 104 104 105 106 107 108 109 109 110 111 112 11...

Page 100: ...ge Kick Spring Right 1 113 280246 Transport Guide Back 1 114 274294 15 Sponge Roller 4 115 274291 Hinge Kick Spring Left 1 116 274295 FPC Holder 1 117 271602 Box Sensor Board 4116 3630 06 004x 01 1 Se...

Page 101: ...JAPAN CASH MACHINE CO LTD 7 5 UBA Pro Transport Unit Exploded View 1 Figure 7 3 UBA Pro Transport Unit Exploded View 1 Figure 7 3 UBA Pro Transport Unit Exploded View 1 201 224 223 221 224 220 216 23...

Page 102: ...PB Worm Gear 1 210 274246 PB Gear ENC 1 211 271599 PB ENC Home Position Board 4116 3630 06 002x 01 1 Service Part 212 274245 PB Gear M05 Z30 1 213 274276 PB Pin B 1 214 274224 PB Bracket 1 215 274288...

Page 103: ...352 Power Supply Communication Harness 3630 05 001x 1 303 274261 CN Bracket 1 304 274239 TR Gear M1 Z24 4 305 274241 TR Gear M1 Z42 1 306 274237 TR Gear A 1 307 274238 TR Gear B 1 308 274240 TR Gear M...

Page 104: ...405 280249 TR ST Motor ENC 1 406 274223 Open Latch R 1 407 274284 Latch Spring 1 408 274244 PB Gear M05 Z44 1 409 274289 PB Guide Spring 1 410 274225 UBA PRO PB Guide 1 411 101172 2x6 P TITE Phillips...

Page 105: ...s Assy 4116 3630 03 002x 1 Service Part 504 234695 TR Feed Motor Pinion Gear 1 505 280249 TR Feed ST Motor ENC 1 506 274222 Open Latch L 1 507 274284 Latch Spring 1 508 144584 Bearing 1 509 058834 2x6...

Page 106: ...s P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 7 1 0 UBA Pro Transport Unit Exploded View 5 Figure 7 7 UBA Pro Transport Unit Exploded View Figure 7 7 UBA Pro Transport Unit Exploded View 5 60...

Page 107: ...Board 4116 3630 06 003x 01 1 Service Part 606 274233 Centering Cover 1 607 280995 Centering Spring 1 608 271601 BAR Sensor 4116 3630 06 005x 01 1 Service Part Lower Barcode Sensor 609 274217 Light Gu...

Page 108: ...Ref No EDP No Description Qty Remark 701 280244 TR Guide Middle 1 702 274268 TR Drive Shaft 4 703 274273 ENT Roller Shaft 1 704 274253 TR Drive Roller 8 705 274251 Slide Roller Gear 1 706 274254 Slid...

Page 109: ...7 P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 7 1 3 UBA Pro Middle Bracket Exploded View Figure 7 9 UBA Pro Middle Bracket Figure 7 9 UBA Pro Middle Bracket Exploded View 813 810 808 807 813...

Page 110: ...ket 1 806 274274 Entrance Gear Shaft 2 807 274215 Light Guide A 2 808 274216 Light Guide B 2 809 274249 Entrance Gear B 1 810 274248 Entrance Gear A 1 811 274250 Entrance Gear M08 Z21 1 812 274262 Cen...

Page 111: ...EDP No Description Qty Remark 901 280248 Bottom Cover 1 902 274265 FG Plate 1 903 274219 Light Guide E 1 904 274266 Release Lever Plate 2 905 274229 Release Lever 1 906 274286 Release Lever Spring 2 9...

Page 112: ...THIS PAGE INTENTIONALLY LEFT BLANK Section 7 UBA Pro Series Universal Banknote Acceptor Exploded Views and Parts Lists P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 7 1 6...

Page 113: ...View illustrations of 7 1 F Faults Table Listing of A 1 Flowcharts operational 2 25 I Installation steps required for 2 1 N Navigation within manual procedure for 1 1 P PC Calibration Preparation for...

Page 114: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD 8 1 8 Section 8 UBA Pro Series Universal Banknote Acceptor Index THIS PAGE INTENTIONALLY LEFT BLANK...

Page 115: ...of the failure execute the Performance Test perform a Sensor readjustment and then repair the Unit by replacing any appropriate parts deemed necessary Fault Table Listings Table A 1 through Table A 3...

Page 116: ...rn the Power OFF and ON again The Host Machine should send a Reset Command to reinitialize the unit If power cannot be applied use a Hex Nut Driver to open the Upper Guide and manually reset the Guide...

Page 117: ...tch failure Refer to Sensor Calibration on page 6 5 regarding DIP Switch settings Refer to Performance Test Using a PC on page 6 8 or Performance Test without a PC on page 6 16 of this Manual and cond...

Page 118: ...ten into the ROM correctly or cannot be read Re download the Program Check that the relative parts are properly assembled and or Harness are connected CPU Circuit Board ON Flashes 4 EEPROM Error EEPRO...

Page 119: ...ry Motor Encoder OFF Flashes 6 Transport Motor Lock Up Motor locked while transporting a Banknote Firmly re seat the Cash Box Check that the relative parts are properly assembled and or Harness are co...

Page 120: ...heck that the ICB settings are properly set Firmly re seat the Intelligent Cash Box Cash Box Table A 6 LED Flash Reject Error Codes For Banknotes Green LED Red LED Reject Errors Banknote Solutions Rel...

Page 121: ...ror occurs Flashes 13 OFF Banknote Length Abnormal The Line Sensors calculated a Banknote length longer or shorter than the specified value Check that the relative parts are properly assembled and or...

Page 122: ...r more than its Settings The number of Barcode Ticket s characters does not match its settings Check that a proper Barcode Ticket is used Check that the Ticket is not damaged or dirty Check that the r...

Page 123: ...9 OFF Upside Down Insertion A Barcode Ticket is inserted upside down Insert a Barcode Ticket in an proper direction The Barcode Ticket insertion direction Flashes 10 OFF Barcode Ticket Length Abnorma...

Page 124: ...tion Refer to Placing Reference Paper on page 6 5 Check that a Reference Paper is not damaged or dirty Refer Reference Paper Handling on page A 14 Check that the relative part is properly assembled an...

Page 125: ...ct Reference Paper is placed in a proper direction Refer to Placing Reference Paper on page 6 5 Check that a Reference Paper is not damaged or dirty Refer Reference Paper Handling on page A 14 Check t...

Page 126: ...0 Calibration Program process failed Check that a correct Reference Paper is placed in a proper direction Refer to Placing Reference Paper on page 6 5 Check that a Reference Paper is not damaged or di...

Page 127: ...0 dll_gre_ref 0000 0000 0000 0200 dc_redr_ref 0000 0000 0000 0400 drr_gre_ref 0000 0000 0000 0800 ull_ore_ref 0000 0000 0000 1000 ul_blu_ref 0000 0000 0000 2000 uc_redl_ref 0000 0000 0000 4000 ur_blu_...

Page 128: ...s may occur when using Reference Paper that has been used for calibrating more than 400 times Table A 11 Barcode Sensor Calibration Error Codes Sensor Error Code Solutions Relative Parts Sensors Upper...

Page 129: ...otes Bezels are available in different shapes and sizes in order to accommodate Banknotes of different widths and different stacking configura tions 1 2 C 4 Checksum a numerical value assigned to a da...

Page 130: ...8 Limited Power Source an electronic circuit designed to prevent damage to a Power Supply in the event a short circuit occurs 1 3 P 9 Pictograph small internationally recognized safety and attention s...

Page 131: ...UBA Pro Series Universal Banknote Acceptor P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD...

Page 132: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro Series Universal Banknote Acceptor Issue 4116 SME 01 00...

Reviews: