© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 2 1
Disassembly/Reassembly
UBA Pro RT/RQ™ Series Banknote Recycler
Section 4
Rubber Pulley and Drive Roller
Removal (Drum 1 Side)
To remove the Rubber Pulley and Drive Roller
from the Drum 1 Side, proceed as follows:
1. Remove the two (2) E-rings (Figure 4-105
a
1
&
a
2
) and the two (2) Bearings (Figure 4-105
b
1
&
b
2
).
2. Remove the three (3) E-rings (Figure 4-106
a
1
through
a
3
) and the single (1) Parallel Pin (Figure
b
).
3. Remove the two (2) Rubber Pulleys (Figure 4-
c
1
&
c
2
) and the single (1) Drive Roller (Fig-
d
).
Solenoid Removal
To remove the Solenoid from the Drum 1 Side,
proceed as follows:
1. Rotate the Handle (Figure 4-107
a
) all the way in
the direction indicated by the Arrow.
2. Pull out the two (2) Tapes (Figure 4-108
a
1
&
a
2
).
3. Peel off the Clip Sticker (Figure 4-108
b
).
4. Remove the two (2) Clips (Figure 4-109
a
1
&
a
2
).
5. Peel off and separate Tapes (Figure 4-110
a
1
through
a
4
).
6. Remove the single (1) E-ring (Figure 4-111
a
),
the single (1) Handle (Figure 4-111
b
), the single
(1) Parallel Pin (Figure 4-111
c
), and the single
(1) Bearing (Figure 4-111
d
).
Figure 4-105
Rubber Pulley and Dive Roller
Removal (Drum 1 Side) 1
a
1
a
2
b
2
Drum 1 Side
Figure 4-106
Rubber Pulley and Dive Roller
Removal (Drum 1 Side) 2
a
2
b
a
3
d
c
1
c
2
Figure 4-107
Solenoid Removal 1
a
Drum 1 Side
Figure 4-108
Figure 4-108
Solenoid Removal 2
a
1
a
2
b
Figure 4-109
Figure 4-109
Solenoid Removal 3
a
2
Figure 4-110
Figure 4-110
Solenoid Removal 4
a
1
a
3
a
2
a
4
Figure 4-111
Solenoid Removal 5
a
b
c
d