© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 8
Section 4
UBA Pro RT/RQ™ Series Banknote Recycler
Disassembly/Reassembly
3. Pick up the Shaft Assy. (Figure 4-33
a
) as illus-
trated by the Arrow
①
, and then remove it in the
direction indicated by the Arrow
②
,
4. Remove the six (6) Screws (Figure 4-34
a
1
through
a
6
) to remove the Pulley Cover (Figure
b
).
5. Remove the Gear Assy. (Figure 4-35
a
).
6. Remove the two (2) Bearings (Figure 4-35
b
1
&
b
2
) from the TR Worm Gear (Twin) (Figure 4-35
c
).
TR Worm Wheel (Twin) Removal
To remove the TR Worm Wheel (Twin) out of the
RT Frame Unit, proceed as follows:
1. Remove the Wheel Assy. (Figure 4-36
a
).
2. Remove the two (2) Bearings (Figure 4-36
b
1
&
b
2
) from the TR Worm Wheel (Twin) (Figure 4-
c
).
TR Motor Harness Assy. Removal
To remove the TR Motor Harness Assy., proceed
as follows:
1. Remove the Motor Assy. (Figure 4-37
a
).
2. Remove the two (2) Screws (Figure 4-38
a
1
&
a
2
).
3. Remove the Detection Plate (Figure 4-38
b
), the
c
) and the Pinion Gear
d
) from the TR Motor Harness Assy.
e
).
Figure 4-33
Figure 4-33
TR Worm Gear (Twin) Removal
(RT Frame Unit) 3
①
a
Figure 4-34
Figure 4-34
TR Worm Gear (Twin) Removal
(RT Frame Unit) 4
b
a
1
a
5
a
4
a
6
Figure 4-35
Figure 4-35
TR Worm Gear (Twin) Removal
(RT Frame Unit) 5
b
1
b
2
c
Figure 4-36
Figure 4-36
TR Worm Wheel (Twin) Removal
(RT Frame Unit)
b
1
b
2
TR Motor Harness Assy. Removal
Figure 4-37
TR Motor Harness Assy. Removal 1
a
Brown
Red
NOTE: For the reassembly, ensure that the
Motor Assy. is installed considering the
positions of the “Brown” and “Red” Cables.
TR Motor Harness Assy. Removal
Figure 4-38
TR Motor Harness Assy. Removal 2
e
b
a
2
c
d