© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 7
Disassembly/Reassembly
UBA Pro RT/RQ™ Series Banknote Recycler
Section 4
3. Separate the Rear Transport Unit (Figure 4-27
a
)
as illustrated.
Flap Motor Harness Assy. Removal
To remove the Flap Motor Harness Assy. out of the
RT Frame Unit, proceed as follows:
1. Remove the five (5) Screws (Figure 4-28
a
1
through
a
5
) to remove the Gear Cover (Figure 4-
b
).
2. Remove the Worm Wheel (Figure 4-29
a
) and the
Worm Gear (Figure 4-29
b
).
3. Remove the Flap Motor Harness Assy. (Figure 4-
a
).
TR Worm Gear (Twin) Removal
To remove the TR Worm Gear (Twin) out of the RT
Frame Unit, proceed as follows:
1. Remove the single (1) E-ring (Figure 4-31
a
), the
single (1) Gear (Figure 4-31
b
), the single (1)
Parallel Pin (Figure 4-31
c
) and the single (1)
Rolled bushing (Figure 4-31
d
).
2. Remove the single (1) E-ring (Figure 4-32
a
) and
the single (1) Bearing (Figure 4-32
b
).
Figure 4-27
Rear Transport Unit Removal (RT
Figure 4-27
Rear Transport Unit Removal
(RT Frame Unit) 2
a
Figure 4-28
Figure 4-28
Flap Motor Harness Assy. Removal
(RT Frame Unit) 1
b
a
1
a
2
a
3
a
4
a
5
Figure 4-29
Figure 4-29
Flap Motor Harness Assy. Removal
(RT Frame Unit) 2
b
a
Figure 4-30
Figure 4-30
Flap Motor Harness Assy. Removal
(RT Frame Unit) 3
a
Figure 4-31
Figure 4-31
TR Worm Gear (Twin) Removal
(RT Frame Unit) 1
a
b
c
d
Figure 4-32
Figure 4-32
TR Worm Gear (Twin) Removal
(RT Frame Unit) 2
b