© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 4
Section 6
UBA Pro RT/RQ™ Series Banknote Recycler
Calibration and Testing
Recycler Solenoid Test (RT Transport)
To run the Recycler Solenoid on the RT Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
3. Set the DIP Switches of the RT/RQ Unit as below
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
6. To start the Test, set the UBA Pro DIP Switch #8
to
OFF
7. The Solenoid will start operating when it func-
tions properly.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Drum 1 Motor Test (RT Transport)
To run the Recycler Solenoid on the RT Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-123).
3. Set the DIP Switches of the RT/RQ Unit as below
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
6. To start the Test, set the UBA Pro DIP Switch #8
to
OFF
7. The Drum 1 of the Recycler will start winding
the Tape until it reaches to “End” and then to
“Full” position back and forward repeatedly.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Figure 6-119
Figure 6-119
Recycle Solenoid Test
(RT Transport) 1
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-120
Recycle Solenoid Test
(RT Transport) 2
DIP Switch #5 ON
ON
1
2
3
4
5
6
7
8
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-121
Figure 6-121
Recycle Solenoid Test
(RT Transport) 3
Green
ON
OFF
Figure 6-122
Recycle Solenoid
Test (RT Transport) 4
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
NOTE: Confirm the functionality aurally by
the sound that the Solenoid is making
while in the operation.
Figure 6-123
Figure 6-123
Drum 1 Motor Test (RT Transport) 1
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-124
Figure 6-124
Drum 1 Motor Test (RT Transport) 2
DIP Switch #6 ON
ON
1
2
3
4
5
6
7
8
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-125
Figure 6-125
Drum 1 Motor Test (RT Transport) 3
Green
ON
OFF
Figure 6-126
Figure 6-126
Drum 1 Motor Test (RT Transport) 4
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8