background image

Align the Machine

2

Align the carriage with the 
attachment below the level of 
hooks (B)

Engage Attachment

3

Engage forward until pivot shaft 
touches the attachment. 
Engage parking brake and raise 
arm so pivot shaft (A) engages 
hooks (B)

Stop the Machine

1

Park on dry level ground

Engage Locking Pins

4

With the Park brake applied, 
press and hold rocker switch (A) 
to divert the side shift service 
to the locking ram. Operate 
service button (B) to engage 
changezee pins

Reviews: