![background image](http://html1.mh-extra.com/html/jcb/lpg-tlt-series/lpg-tlt-series_quick-reference-manual_3638051004.webp)
Align the Machine
2
Align the carriage with the
attachment below the level of
hooks (B)
Engage Attachment
3
Engage forward until pivot shaft
touches the attachment.
Engage parking brake and raise
arm so pivot shaft (A) engages
hooks (B)
Stop the Machine
1
Park on dry level ground
Engage Locking Pins
4
With the Park brake applied,
press and hold rocker switch (A)
to divert the side shift service
to the locking ram. Operate
service button (B) to engage
changezee pins