![jcb CA Series Instruction Manual Download Page 6](http://html1.mh-extra.com/html/jcb/ca-series/ca-series_instruction-manual_3562283006.webp)
T210 / T245 / T470
NT115
AN115
AM120
AT420
NP115
PA120
HT420
HT470
DS360
DR560
AP250
AL250
SF280
JT-TA
TE-TB
NH-A
PA120
PA120
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
0.9-1
0.9-1 Ø
0.9-1 Ø
NH
NH
NH
AP250
AP250
AP250
AP250
T210 / T245 / T470
NT115
AN115
AM120
AT420
NP115
PA120
HT420
HT470
DS360
DR560
AP250
AL250
SF280
JT-TA
TE-TB
NH-A
PA120
PA120
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
0.9-1
0.9-1 Ø
0.9-1 Ø
NH
NH
NH
AP250
AP250
AP250
AP250
T210 / T245 / T470
NT115
AN115
AM120
AT420
NP115
PA120
HT420
HT470
DS360
DR560
AP250
AL250
SF280
JT-TA
TE-TB
NH-A
PA120
PA120
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
0.9-1
0.9-1 Ø
0.9-1 Ø
NH
NH
NH
AP250
AP250
AP250
AP250
T210 / T245 / T470
NT115
AN115
AM120
AT420
NP115
PA120
HT420
HT470
DS360
DR560
AP250
AL250
SF280
JT-TA
TE-TB
NH-A
PA120
PA120
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
AL250
0.9-1 Ø
0.9-1 Ø
0.9-1 Ø
0.9-1
0.9-1 Ø
0.9-1 Ø
NH
NH
NH
AP250
AP250
AP250
AP250
6
Mark
2. Inserting
Changing Cartridges
To change a catridge safely, unplug the tool or turn off the station before following these guide-
lines.
Loosen the screw and remove the cartridge.
Use PLR195 pliers if still hot.
1. Removing
Important:
Insert the new cartridge as far as
the mark for a correct connection.
4. Fixing
Align the cartridge tip with the feeder
nozzle. Use PLR195 pliers for a correct tip
alignment.
3. Aligning
Important:
Tighten the screw again. This is
necessary for the tool to function. Be careful
not to over-tighten it.
Alignment
Summary of Contents for CA Series
Page 1: ...INSTRUCTION MANUAL CA Manual Feed Soldering Station...
Page 18: ...Notes 18...