![background image](http://html1.mh-extra.com/html/jcb/45z-1/45z-1_service-manual_3577913045.webp)
03 - Attachments, Couplings and Load Handling
27 - Bucket
00 - General
03 - 13
9813/6400-2
03 - 13
Figure 8.
F
E
A
D
A
B
C
A
D
A
B
C
A
Tipping lever lynch pin
B
Spacer
C
Pivot pin
D
Dipper pivot lynch pin
E
Spacer
F
Pivot pin
G
Bucket
H
Dipper
Install
1. Use a suitable lifting device to position the bucket
flat on level ground.
2. Reverse the machine while aligning the dipper
end with the bucket tipping lever.
3. Carefully operate the excavator controls to line
up the holes in the dipper and tipping link with the
holes in the bucket.
4. Install the pivot pin. Install the spacer and the
lynch pin.
5. After the dipper pivot pin has been locked in,
install the tipping link pivot pin, spacer and lynch
pin.
Summary of Contents for 45Z-1
Page 2: ...9813 6400 2 Notes Find manuals at https best manuals com...
Page 4: ...Notes 9813 6400 2 Find manuals at https best manuals com...
Page 8: ...Notes 01 2 9813 6400 2 01 2 Find manuals at https best manuals com...
Page 22: ...Notes 01 16 9813 6400 2 01 16...
Page 26: ...Notes 01 20 9813 6400 2 01 20...
Page 30: ...Notes 01 24 9813 6400 2 01 24...
Page 32: ...9813 6400 2 2018 02 07 Acronyms Glossary PMV Pressure Maintenance Valve...
Page 34: ...Notes 03 2 9813 6400 2 03 2...
Page 38: ...Notes 03 6 9813 6400 2 03 6...
Page 51: ...This as a preview PDF file from best manuals com Download full PDF manual at best manuals com...