![background image](http://html1.mh-extra.com/html/jcb/1-86c-1-tab/1-86c-1-tab_quick-start-manual_640056006.webp)
6
Please see operator manual for full details.
Tie Down Points
Fig 2
A
Rear track tie-down points
C
65R-1 / 67C-1 Angle = 46.2 ± 1.5°
Angle = 47 ± 1.5° (dozer)
8-10T
Angle = 40 ± 1.5°
B
Front track tie-down points
D
65R-1 / 67C-1 Length = 2,000 ± 100mm
8-10T
Length = 2,415 ± 100mm
The correct tie down positions are identified on the machine by their labels:
A
Rear track tie-down points (both sides)
B
Front track tie-down points (both sides)
Fig 3