Page 2: ...UST read ALL the disclaimers and safety and other instructions in the Operators Manual before initially operating this product Accordingly no legal claims can be entertained on the basis of the data i...

Page 3: ...es Key Components General Checks Start Up Instructions Control Panel Overview Lifting Positioning Stacking Emergency Stops FAQ 3 Please consult your manual for full information or consult your local d...

Page 4: ...local dealer MODEL 1 25QE 1 50QE Single Phase Output V 230 230 Total Storage Capacity kWhr 23 46 Maximum Recommended Depth Of Discharge 90 90 Capacity To 90 Depth Of Discharge kWhr 20 41 Continuous Ou...

Page 5: ...your manual for full information or consult your local dealer Front View Side View A Lifting Points x4 B Tie down points x4 C Fork pockets D Ventilation grilles E Control F Connections Isometric view...

Page 6: ...EY COMPONENTS CONTROLS 6 Please consult your manual for full information or consult your local dealer A Control Screen B MCB C ON OFF Buttons D Emergency Stop E Generator Autostart Terminals A B C D E...

Page 7: ...COMPONENTS CONNECTIONS 7 Please consult your manual for full information or consult your local dealer F 16A Maintenance Charge Connection G 32A Power Out H 63A Charge Connection J 63A Power Out J H F...

Page 8: ...ires are in good condition Ensure the power pack is located on flat level ground Ensure the power pack is located to prevent sitting in standing water Ensure that the power pack is located so as to av...

Page 9: ...4 Once active the control panel display will indicate current status 5 Unit is now connected to load NOTE Generator autostart terminals E will energise if site load exceeds 8kW de energise once it dro...

Page 10: ...onsult your local dealer A Input Supply B Inverter Status detail below AC Input AC Output A C D Inverting Bulk Passthru Off No AC input batteries only Batteries are charging no load AC connected to lo...

Page 11: ...allow lifting by equipment with a stand fork carriage 11 Please consult your manual for full information or consult your local dealer NOTE Always ensure that lifting equipment is rated to lift the lo...

Page 12: ...however there are precautions that should be undertaken to ensure a long service life Units should be located on flat level ground If the machine is sat in standing rising water then if the level reac...

Page 13: ...to be stackable up to 2 units in use or 3 units in storage Model 1 25QE and 1 50QE are interchangeable NOTE When stacking equipment always ensure that the roof mounted securing pegs are engaged with t...

Page 14: ...sing the STOP button This can be clarified in the Control Panel section of your Operators Manual The emergency stop button is a twist to release type and will need a turn clockwise to disengage 14 Ple...

Page 15: ...2kW load would drain the batteries in either 10 or 20 hours depending on you Power Pack model If you apply more load it will drain faster less load and it will drain slower The inverter output is rate...

Page 16: ...r if the battery capacity falls to 5 You should check that your generator is correctly sized The JCB Power Pack will draw up to 7kW of single phase power when recharging Your generator should be rate...

Page 17: ...be relied upon in relation to suitability for a particular application Guidance and advice should always be sought from your JCB Dealer JCB reserves the right to change specifications without notice...