JBL ARENA 6IC Instruction Manual Download Page 5

5

JBL Arena In-Ceiling Architectural Loudspeaker

Instruction Manual

MOUNTING THE SPEAKERS

For New Construction

If you wish to pre-install a rough-in frame for the speakers before 
the drywall is installed in new construction, you will need to purchase 
the correct rough-in frame kit for your loudspeaker model from your 
authorized JBL dealer. Detailed mounting instructions are supplied with 
the rough-in kit. After the drywall is installed, follow the installation 
instructions in 

For Existing Construction,

 below.

For Existing Construction

Note: The installation procedure is the same for all models covered by 
this manual.

1.  Ensure that the drywall, plywood or other ceiling material is 1/2" –  

2" (13mm – 51mm) thick and capable of withstanding the weight of 
the speaker being installed.

Make sure to allow at least 1" (25.4mm) between the edge of the 
supplied installation template and any rafters or other obstructions behind 
the wall, so the speaker’s locking mechanism will have room to engage 
fully. Perform an obstruction survey to be sure that there are no studs, 
lengths of conduit, pipes, heating ducts or air returns in the ceiling cavity 
that will interfere with the speaker.

Mounting 

Opening

1" 

(25.4mm)

1" 

(25.4mm)

1" 

(25.4mm)

 

2.  Determine the correct speaker location and use the template included 

with the speaker to mark the ceiling material.

 

3.  Cut the ceiling drywall along the mark you made in Step 2 to create the 

mounting opening.

 

4.  Connect the speaker to the amplifier as explained in 

Connecting to the 

Amplifier,

 on page 4.

NOTE: For 6ICDT, you must connect both left and right speaker wire from 
the amplifier.

 

5.  Attach the speaker's seismic tab to a support line, as per local safety 

regulations. 

Seismic Tab

Support Line

6.  Make sure all four speaker clamps are in their “ready-to-mount” 

position.

 

Speaker Clamps in 

Ready-to-Mount Position

Reviews: