
Xuzhou Jiayu Solar Energy Technology Co.,Ltd.
North of Peigong Road, East of Hankang Road, Peixian Economic,Development Zone, Xuzhou City, Jiangsu Province, 221000, P.R. China
Website:
Email: [email protected]
Tel: +86 13151232006
Installation Manual
MECHANICAL INSTALLATION
Selecting the location
Select a suitable location for installation of the module.
The module should be face sun, reduce loss from exterior sunshine and raise export power.
Detailed information on optimal module orientation will depend on the sunlight and specific system design.
For the optimal annual output from the solar module, we suggest the mounting angle be equal to the latitude
of the city where the modules are being installed. For the optimal battery performance in winter months, we
suggest the mounting angle be 10 degrees greater than the latitude of the city where the installation is being
done. For optimal solar battery performance in all four seasons
,
we suggest the mounting angle be 10
degrees less than latitude of the city where the installation is being done.
A mounting location should be chosen where the module will not be shaded at any time of the day.
Do not install the module near other equipment or in locations where flammable gases can be generated or
collected.
The fire rating of this module is valid only when mounted in the manner specified in the mechanical mounting
instructions.
Modules can not be used in other excessive and harsh environments, such as hail, snow, sand, smoke, air
pollution, soot, flammable gases, near open flames, and highly corrosive substances (salt, salt spray, salt
water, acid rain) , As this will affect the module's safety and performance. If the installation environment is
special, such as the seaside, farm, high humidity or wind and other large environment, please consult your
local dealer for professional support and confirmation. If you need to be installed at a high altitude, the
altitude should not exceed 2000m.
Selecting the Proper Mounting Structure and Hardware
1
.
Mounting Structure
(
1
)
Screw fitting:
Observe all instructions and safety precautions included with the mounting system to be used with the
module.
The aluminous frame has eight (8) mounting holes, and two (2) holes for grounding.
Do not drill holes in the glass surface of the module. Doing so will void the warranty.
Do not drill additional mounting holes in the module frame. Doing so will void the warranty.
Modules must be securely attached to the mounting structure (racking) using eight (8) mounting points for
normal installation. If heavy wind or snow loads are anticipated, we require advance notification. Load
calculations are the responsibility of the system designer or installer.
The support module mounting structure must be made of durable, anticorrosion and UV-resistant material.
Hardware
The size of fixing hole for common modules is 9*14 and the size of the fixing nut is M8. The size of fixing hole
for common modules is 7*12 and the size of the fixing nut is M6.Drawings as follows.
2 / 13