background image

Page 

6

 of 

6

 

 

Assembly Instructions:  

13.

 

Attach the loop on one end of the bottom cord to the S-hook on one of the bottom 
sliding collars.  Thread the other end through the Clam Cleat fitting, as shown.  Pull 
the free end of the cord to draw the bottom cord taunt.  Next, tie off the six (6) side 
cords around the uprights, making sure the net is approximately centered within the 
playing area.                                                                                

14.

 

Raise the center of the net to the full official net height by cranking the handle.  Adjust all 
net side cords to further tension the net. 

15.

 

When releasing tension on the net, first untie the side cords and release tension on the 
bottom cord, and then slowly release tension of the top cable. 

16.

 

To remove the unit for storage, disconnect the net from the 2 uprights and carefully lift 
each upright from the floor sleeve. 

17.

 

For player safety cut any excess chain before putting system into service. 

 

 

 
 
 

INSTALLATION AND USE CONSIDERATIONS 

1)   The unit is designed for high level competition play.  Consequently, when installed 
and operational, the unit is subject to considerable stress loads.  It is essential to inspect 
all parts before each use. 
2)   Do not use this equipment without the protective upright padding properly fastened in place. 

 

Tennis:

  

Badminton:

 

VELCRO STRAPS  

VOLLEYBALL 
ANTENNA  

 

NET DOWELS  

(BOTH ENDS) 

NOTE: SAG, ADJUST BY PLACING 
THE TOP 

COLLARS ¾” HIGHT 

THAN DESIRED NET HEIGHT. 

Volleyball: 

7’ 11 5/8” (2.43 m) Men’s 

7’ 4 1/8” (2.24 m) Women’s 

5’  

(1.52 m) 

3’-6”  

(1.07 m) 

Summary of Contents for PVB-1300

Page 1: ...Page 1 of 6 PVB 1300 Installation Instructions Call Jaypro Sports Equipment at 1 800 243 0533 during regular business hours for technical support www jaypro com ...

Page 2: ...ND CLAMP COLLAR P N PVB 13 7 1 5 TOP ROLLER CLAMP COLLAR P N PVB 13 8 1 6 BOTTOM SLIDING COLLAR P N PVB 13 9 2 7 3 1 2 OD UPRIGHT P N PVB1300B 2 8 WINCH w HARDWARE P N PVBWINCH 1 9 3 8 16 x 4 1 4 BUTTON HEX SCREW PART OF PVBWINCH HARDWARE KIT 1 10 3 8 ACORN NUT PART OF PVBWINCH HARDWARE KIT 1 11 3 8 x 4 CARABINER P N HM5019 1 12 1 4 x 24 LONG CHAIN P N CN0001 1 ITEM IMAGE DESCRIPTION QTY ...

Page 3: ...9 16 Box Socket Wench 1 Tape Measure o Unpack all parts and check against parts list to ensure that all have been included o Inspect all parts for damage Report any damages to the trucking company These instructions assume that the appropriate ground sleeves have been correctly installed The PVB 1300 will fit most 3 inner diameter ground sleeves The inside bottom surface of the ground sleeves must...

Page 4: ...of the top collars should be placed about above the desired height of the net The bottom collars should be positioned about 39 below the top collars 8 Ensure both side dowels are inserted in the side net binding Position the net between the 2 uprights 9 Thread the webbing strap from the winch over the roller clamp and connect the end of the cable to the snap buckle Connect the other end of the net...

Page 5: ...TEM 1 ATTACH BOTTOM CORD TO COLLARS This cleat comes pre assembled on PVBN 5 nets Maximum 1 4 rope Volleyball net this side This loop would go around The volleyball pole Or in S Hook of a sliding collar On a PVB 1300 or PVB 1250 ...

Page 6: ...ttom cord and then slowly release tension of the top cable 16 To remove the unit for storage disconnect the net from the 2 uprights and carefully lift each upright from the floor sleeve 17 For player safety cut any excess chain before putting system into service INSTALLATION AND USE CONSIDERATIONS 1 The unit is designed for high level competition play Consequently when installed and operational th...

Reviews: