![Jaypro Sports FSG-2 Installation Instructions Manual Download Page 6](http://html1.mh-extra.com/html/jaypro-sports/fsg-2/fsg-2_installation-instructions-manual_3494363006.webp)
-
-
Page
6
of
6
15) Square the frame and tighten all hardware. Start by aligning the corner piece with the
upright extrusion and closing any gap between the corner and the upright. Now tighten
the two screws furthest from the corner hub. Once they are secure you can tighten the
bolt closest to the corner hub. Follow this same procedure for securing the crossbar to
the corner piece. Once the corners are secured the rest of the goal hardware can be
tightened down.
16) Layout net and identify corners. Drape net over or under frame and attach using
velcro strips cut at 12 inches long each and spaced approximately 12 inches apart.