background image

l STEP 

4)

A. Slide Steel  Sleeve  (J) thru  both  tubes welded at the top  end of Spring .. 

Assisi Cartridge (C).  Place  tho top of Spring-Assist between  Main 

extension (F), align the  Steel Sleeve (J) with Iha second set of welded 

tubes on  the  Main Extension Arm (F),  place the  Stainiess steel  Rim  Heiqht 

  /  

Indicator (K)  beside the  Spring-Assisi Crntridgo (C). 

Slide one Washer M16  (#12) over one Hex Bolt M16x320mm 

(#7),  and  slide this Bolt all  the way thru Main Extension Arm (F), one 

Nylon washer M16(#2),  Steel  Sleeve  (J),  Rim  Heigh! indicator (K). 

another Nylon washer (#2)  , and the other side of Main  Extension Arrn 

(F).  Secure ii wilh one  Flat Washor M·I 6 (/112),  one  Lock nut M16 (1115). 

Do  not over tighten  this bolt because this ls the pivot point. 

lvtal,e sure  lhe  Rim  Height lndicator(K) hang freely along side of Spring-

Assist Cartridge (C). 

Nylon washer locates between Steel steeves {J) and Main Extension

Arm (F).  They may be  factory-assembled already.

8. Att<:1ch  the bottom of Spring-assist Cartrldqes  (C)  to  the  Main post  Bracket

by  using  a Hex  Boll M16x185mm  (#8),  two Flat Washers  M16  (/112),  one 

Nylon  Washer M16  (#2)  ancl  one  Hex  Nul M16  (#'15). 

Note: Nylon  washer goes fJetween  two  Cartlidges. 

C.  Remove and  discard  the Steel  spreader bracket fro1T1  the  Spring-Assist

Cartridges.

(  STEP 

5) 

A. Attach  the Two  Upper Extension Arms (G) to  Main  Post  (A)  with 

one  Hex  Bolt  M16x295mm  (/16),  two  Flat Washers  IVl'l6  (l/'12). 

two  Nylon washers M16  (112)  and  one  Lock nut  M16  (#15)

Note: the  Nylon  washers  go between  Upper extension  arm  and Main 

Post. 

Do not tighten at this time. 

(  STEP6J 

A.  Attach  the  Backboard  Mounting Bracket (N)  to  lhe  back of

B:::1ckboard  as  shown,  with  two  Carric1ge  Bolt fv11  0x35rnrn  (#17), 

lwo  Fial Washers  M10  (#18),  and  two  Lock  nuts  M10  (/119) 

Do  not tighten al this time. 

K' 

 I 

c-

12 

If 

15 

  /  

.<,· 

Spreader 

bracket 

-cc'

\"'\ 

12  6

'  G 

Summary of Contents for CV664A

Page 1: ...ROPFRTY Di i L CiF l I F ISF Ill I D Ill W l NIN S Nil C 1 1 JTIONS TO FNSI il t YOU S 1 1 l TY Dll NOT ITTl ll T T O SSH llliY THIS SYSTHvl IV 1 1IOVT C IRII IIY l F IDIN AND FOLi JIVING ILL NSTRUCTIONS BLCr N BY L JT liY N i ND L K N NVL HOPV O F LL P1 RTS l Sl Ci Tl E RTS LIST PPO DU www jaypro corn 800 243 0533 976 Hartford Tpke Waterford CT 06385 USA Keep this instruction manual in case you h...

Page 2: ...TIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND W i l l VOID THE WARf ANTY Tt1e owner rnust ensure that all players know and follow these rules to safely operate the system Proper and complete assembly use and supe1vision is essential for proper operation ancl to rec uce the risk of accident or injury A high probability of serious injury exists if this system is not installed maintained ...

Page 3: ... 4 1 6mm Lock Pin 1 Flex Rim Separate pack 5 2 Hex Bolt M18x l20mm M 1 Rim Pad Pre attached 6 1 Hex Bolt M16x295mm N 1 Backboard mounting bracket 7 2 Hex Bolt M16x320mm UNDERGROUND PARTS 8 1 Hex Bolt M16x185mm U 1 1 Anchor Template 9 1 Hex Bolt M16x135mm U2 4 1smrn Anchor J bolts 10 2 Hex Bolt M12x70mm U3 8 Thick washer for J bo t 1 1 4 Washer for M IS Bolt U4 12 Hex nut M 13 12 10 Washer for M16 ...

Page 4: ...concrete remains straight and square The form should be placed about 1 2 above the playing surface to allow for water drainage c Bell out the bottom of the hole NOTE i i qunrc liolc prevents thi rotation of the concrete NOTE The trca behind the playing surface must be ck 1red o f f by at least f ect w cnabk tht user to tand behind the pole to adjust the Rim height STEP B A Thread a 18mm Hex Nut U4...

Page 5: ...sembly back and forth repeatedly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure he Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bolts ii I i U1 i i f ...

Page 6: ...ho1 Nn in FIGURE 1C U3 U2 I l STEP2 J FIGURE 1A FIGURE 1B Nylon washer 1 ray be factory installed A Slide the Main Extension Arm F over the top of the Main Post A and attach to the lower pivot tube with a M18x320mm Hex Bolt 5 two M18 Flat Washers l 11 two Nylon Washers M18 1 and one Lock nut M18 14 Do not over tighten this bolt and nut Playing Court FIGURE IC Note make sure Nylon washers locate be...

Page 7: ...pring Assist Cartridge C Nylon washer locates between Steel steeves J and Main Extension Arm F They may be factory assembled already 8 Att 1ch the bottom of Spring assist Cartrldqes C to the Main post Bracket by using a Hex Boll M16x185mm 8 two Flat Washers M16 112 one Nylon Washer M16 2 ancl one Hex Nul M16 15 Note Nylon washer goes fJetween two Cartlidges C Remove and discard the Steel spreader ...

Page 8: ... C Re c1ttach Sprin J box cover to the Rim with removed screws i 1 11 1l R2 R3 NOTE Use a level to make sure rim is level side to side before tightening nuts Tiqhten the two bolts and nuts used in STEP 6 I After cverythin9 is square rnake sure ail nuts on the systern have betm tiqhtene1J NOTE Do not ovN i9hton he Nuts mafw sure the uni can he ac jusied up ancl clown B To appiy t h E Him Height Sti...

Page 9: ...FTER GOAL HAS BEEN MOUNTED NOTE THE TWO VERTICAL SPRINGS CAN BE TIGHTENED IF MINOR LOOSENESS OR RATTLING OCCURS ONE OR TWO TURNS OF THE HEX NUT IS SUFFICIENT DO NOT OVER TIGHTEN AS IT WILL DAMAGE GOAL MECHANISM BACKBOARD AND COULD LEAD TO PLAYER INJURY ADJUSTING BREAKAWAY AMOUNT OF FORCE REQUIRED TO RELEASE LOCKING MECHANISM CAN BE ADJUSTED ON BREAKAWAY GOALS REMOVE THE COVER PLATE AND INSERT 3 16...

Reviews: